SPRAY HEADER-DRG NO.IOP072983 ZM-1 and 2,SPRAY HEADER-DRG NO.IOP072984 ZM-1 and 2,SIDE GUIDE SCREW
Deadline
04 Nov 2025
Location
SALEM, TAMIL NADU
SPRAY HEADER-DRG NO.IOP072983 ZM-1 and 2,SPRAY HEADER-DRG NO.IOP072984 ZM-1 and 2,SIDE GUIDE SCREW
Tender Key Details
Organization
Salem Steel Plant
Department
Steel Authority of India Limited
Quantity
2886
Bid Validity
60 (Days)
Bid Type
Two Packet Bid
Tender Overview
SPRAY HEADER-DRG NO.IOP072983 ZM-1 and 2,SPRAY HEADER-DRG NO.IOP072984 ZM-1 and 2,SIDE GUIDE SCREW
Important Timeline
Start: 14 Oct 2025
End: 04 Nov 2025
AI-Powered Bidder Prediction
Discover which companies are most likely to bid
Unlock Bidder Insights
Get AI-powered predictions about which companies are most likely to bid on this tender
Additional Information
SPRAY HEADER-DRG NO.IOP072983 ZM-1 and 2,SPRAY HEADER-DRG NO.IOP072984 ZM-1 and 2,SIDE GUIDE SCREW
Item Category
SPRAY HEADER-DRG NO.IOP072983 ZM-1 and 2 , SPRAY HEADER-DRG NO.IOP072984 ZM-1 and 2 , SIDE GUIDE SCREW ROD and NUT - ZM2 , MACHINED HEX HEADED BOLT M16X70 CLASS8.8 , MACHINED HEX HEADED BOLT M20X80 CLASS8.8 , BEARG.CAP PNO.595-017-798 SBM APL3 , SPACER RING PNO595-016-833 SBM APL3 , TURBINE ASSLY PART 595-017-780 FOR APL3 , TURBINE ASSLY PART 595- 017-781 FOR APL3 , TURBINE ASSLY PART 595-017-782 , BEARG.COVER PNO595-016-836 SBM APL3 IND , SBM TURBINE SHAFT-APL-3 IND , TURBINE CLAMP AND BLOCK FOR APL-3 , TUR ASS PULLY SIDE COVER 595-016-835 , TUR ASS PART SHOT BLASTING-595-017-778 , M8X35 or 40MM BOLT-APL3 SBM BUCKET BOL , SHOT BLASTING LOCKING DISC-595-016-053 , BM ROLLS SPLINE SHAFT DRG.127577 , BM2 BRUSH ROLL SPLINE FLANGE DRG.132856
Organization Details
Authority
Organization
Salem Steel Plant
Department
Steel Authority of India Limited
Ministry
Ministry of Steel
Contact
State
TAMIL NADU
Documents & Downloads
GeM-Bidding-8470115.pdf
Main Document
BOQ Document
BOQ
BOQ Document
BOQ
Buyer uploaded ATC document
ATC
GEM General Terms and Conditions Document
GEM_GENERAL_TERMS_AND_CONDITIONS
Required Documents from Seller
Experience Criteria,Certificate (Requested in ATC),OEM Authorization Certificate,Additional Doc 1 (Requested in ATC),Additional Doc 2 (Requested in ATC),Additional Doc 3 (Requested in ATC),Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Additional Info
Evaluation Method
Item wise evaluation/
Inspection Required
No
Arbitration
No
Bid to RA
No