Tender Overview
Organization: Indian Army, Department Of Military Affairs. The procurement scope covers multiple construction items: Two Chimney, 22 wooden doors sized 2.5 x 3 feet, Kota Stone slabs of 30 x 30 feet and 15 x 15 feet, plus fitting and labour charges. The opportunity requires local Jodhpur vendors with a physical shop for after-sales service and to participate through a mandatory on-site demonstration at the Supply Depot, Jodhpur. Demonstrations must use the brand's genuine items; lower-spec substitutions lead to disqualification. Estimated value is not disclosed in the data, but the scope suggests a substantial civil-works and allied-materials package. This tender emphasizes performance demonstration as a critical technical criterion and invites qualified regional bidders.
Technical Specifications & Requirements
- Demonstration of accessories/items at buyer’s location within two days after bid opening as part of TEC evaluation.
- Demonstration materials must be of the brand/spec offered; non-conforming items may be rejected.
- Demonstration will be checked at Supply Depot Jodhpur and is mandatory for technical evaluation.
- Tender requires local/regd vendors from Jodhpur with a physical shop for after-sale service.
- Items include Two Chimney, 22 wooden doors (2.5 ft x 3 ft), and Kota Stone slabs (30 ft x 30 ft; 15 ft x 15 ft); fitting and labour charges to be provided.
- The data sheet can be requested during TEC; acceptance depends on compatibility with BOQ and demonstration performance.
Terms, Conditions & Eligibility
- Bid Security declaration and compliance with Appendix ‘A’; formal acceptance certificate (Appx B) required.
- GSTIN certificate and proof of registration.
- Experience criteria:至少 1 年在任何政府机构的相关经验。
- Demonstration timing and strict adherence to specification are mandatory.
- Regd local vendors from Jodhpur with physical shop are preferred for after-sales support.
- The ATC indicates a requirement for complete data sheets, brand details, and actual photos during TEC; product acceptance depends on demonstration outcomes.