Tender Overview
**Rourkela Steel Plant, a unit of Steel Authority of India Limited, invites bids for pink HDPE bags intended for ammonium sulphate bagging. The procurement covers multiple delivery milestones: 15,000 units within 60 days and 285,000 units within 120 days from contract, to be used in Sundargarh, Odisha. The tender enforces a 25% quantity variation under the option clause and requires printing specifications, bundling, and data sheet conformity. Key distinctions include on-order rate printing, GST handling guidance, and supplier data integrity checks through DS/Audit. This opportunity targets suppliers offering standard HDPE packaging with batch-control capability and strict documentation alignment. The contract scope is limited to supply, with firm pricing through delivery and a defined inspection framework.
Technical Specifications & Requirements
- Packing method: Bundles of 500 bags per bundle; contents printed on one side of each bag; rate printing details provided after order.
- Product documentation: Upload Data Sheet matching offered parameters; ensure no mismatch with technical specs or bid rejection.
- Quality & compliance: G/C & Manufacturer's Test Certificate required with every consignment; inspection conducted at RSP stores.
- Delivery & scope: 15,000 EA in 60 days + 285,000 EA in 120 days; scope is strictly purchase of goods (HDPE bags).
- Invoices: Generated in consignee name with consignee GSTIN; GST invoice and GST portal payment screenshot to be uploaded on GeM.
- Printing & content: Rate printing instructions to be communicated post-order; contents printed on one side of each bag.
Terms, Conditions & Eligibility
- Option clause: Purchaser may adjust quantity by up to 25% during contract; extended delivery time applies with a defined calculation.
- GST guidance: Bidder responsible for applicable GST; reimbursement as actuals or applicable rate, capped to quoted GST percentage.
- Vendor code documents: Submit PAN, GSTIN, canceled cheque, and EFT mandate certified by bank.
- Data Sheet: Mandatory data sheet upload; avoid technical parameter mismatches.
- GST invoicing: Ensure invoice bears consignee GSTIN; upload GST invoice copy and GST payment screenshot on GeM.
- ATC & inspection: Special terms require on-time inspection by RSP and adherence to guarantee clauses.