Tender Overview
The procurement is issued by Indian Army (Department Of Military Affairs) for a Portable fire Pump. The BOQ shows 0 items, and the estimated value/EMD are not disclosed, signaling a potentially open scope. The buyer reserves a 25% quantity variation during both initial and currency periods, with delivery timing linked to the original timeline and a minimum 30-day extension rule. An ATC document is available for bidder reference, and a formal delivery/option process is implied by the clause in the T&C. This tender focuses on equipment readiness for rapid deployment and flexible order handling, under standard army procurement discipline. The emphasis is on compliant supply, with option-based expansion possible at contracted rates and a defined calculation method for extended delivery time. This opportunity appears suitable for suppliers experienced in government security equipment provisioning and capable of scalable fulfillment.
Technical Specifications & Requirements
- Product: Portable fire Pump
- Category: Government security/essential emergency equipment procurement
- BOQ: Total Items 0 (no itemized quantities listed)
- Key term: 25% increase/decrease in bid quantity at contract placement and during contract currency
- Delivery: Calculated extension formula based on (Increased quantity รท Original quantity) ร Original delivery period, minimum 30 days
- Documentation: An ATC document is available; no explicit technical specs provided in the data
- Standards/Certification: Not specified in the tender excerpt; refer to ATC for details
Terms, Conditions & Eligibility
- EMD amount not disclosed in the data; bidders should verify in the ATC/documentation
- Quantity variation: up to 25% of bid/contracted quantity
- Delivery window: commences from the last date of the original delivery order
- Additional time: calculated per formula with a minimum of 30 days
- Submission requirements: ATC document exists; verify all terms in the ATC and Buyer Added Terms
- Compliance: bidders must adhere to option clause and delivery mechanics as specified
- Payment terms: not specified in the provided data; consult ATC for clarity
- Warranty/AMC: not specified; check official tender terms in ATC
