Tender Overview
The National Rural Health Mission (NRHM) State Health Society, Gujarat invites bids for Oxygen Gas Regulators (Version 2) – Q2 in AHMEDABAD, GUJARAT. The procurement references EMD ₹30,000 and permits a 25% quantity adjustment during contract execution. Bidders must align with the purchaser’s option to alter ordered quantities by up to 25%, with extended delivery times calculated as (additional quantity ÷ original quantity) × original delivery period, minimum 30 days. The contract contemplates advance sample approval before bulk manufacturing, with an upfront submittal of 2 samples within 5 days of award. A state-level MSE preference is applied for eligible bidders with valid Udyam Registration. This tender emphasizes conformity testing and on-demand test reports. This opportunity targets suppliers capable of delivering regulated oxygen gas regulator assemblies that meet specific performance and material criteria. The absence of a BOQ indicates the focus on standardized regulator specifications and supplier capability. The opportunity is location-specific to Ahmedabad under Gujarat health procurement, with emphasis on compliance and timely delivery.
Technical Specifications & Requirements
- Product: Oxygen Gas Regulators (Version 2) – Q2
- Key performance/parameters: Stage of Pressure Regulation, Number of Pressure Gauges, Regulator Type, Minimum Output Pressure, Maximum Output Pressure, Rated Inlet Pressure, Flow Rate (Standard Discharge), Flow Rate Accuracy
- Construction: Body Material, Load Spring Material, Diaphragm Material, Regulator Handle Knob Type, Knob Material, Inlet/Outlet Connection Type
- Buyer-specific: Optional Accessories and mandatory Test Reports confirming conformity to product specification
- Compliance: Availability of test reports on demand and certificates on request from the consignee
- EMD: ₹30,000 as bid security; 25% quantity adjustment rights held by Purchaser
- Quality/Standards: Explicit references to conformity testing and supplier‑provided certificates as per buyer’s demand
- Delivery context: Delivery chronology linked to sample approval milestones; bulk supply post-approval
- Special clauses: Sample approval process, with potential remedies for non-conformity or delays
Terms, Conditions & eligibility
- EMD: ₹30,000 payable as specified in terms; required for bid submission
- Delivery timeline: Extended delivery time calculations applied if option is exercised, minimum 30 days; delivery starts after final order date
- Purchase preference: State-level MSE preference for eligible bidders with valid Udyam Registration
- Advance sample: 2 samples due within 5 days of award; failure to approve may adjust delivery without LD
- Sample costs: Samples supplied free of cost unless stated; bulk supply must conform to approved sample
- Documentation: Compliance with terms; submission of required technical and commercial documents as per T&C; non-compliance may lead to termination
- Sample approvals impact: If buyer delays approval, delivery period is reset; bulk supply can be terminated for major deviations
- Fault tolerance: Purchaser may exercise quantity increase/decrease up to 25% of bid/contract quantity
