Directorate General Of Lighthouses And Lightships has released a public tender for Stepper motor 10 Kgcm, Stepper motor 20 Kgcm, Stepper motor 40 Kgcm, Stepper motor Controller 10 Kgcm, Stepper motor Controller 20 Kgcm, Stepper motor Controller 40 Kgcm in JAMNAGAR, GUJARAT. Quantity: 32. Submission Deadline: 05-08-2025 11: 00: 00. Download documents and apply online.
GEM
Procurement Opportunity: Stepper motor 10 Kgcm,Stepper motor 20 Kgcm,Stepper motor 40 Kgcm,Stepper motor Controller 10 Kgcm, in JAMNAGAR, GUJARAT
Progress
Issue14 Jul 2025, 05:40 pm
AwardPending
Quantity
32
Category
Stepper motor 10 Kgcm
Bid Type
Two Packet Bid
Categories
2
Bill of Quantities (BOQ)
6 Items
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Stepper motor 10 Kgcm | Stepper Motor Shaft length 100 mm Shaft diameter 10 mm 10 Kgcm | 6 | nos | buyer2-dlljam | 90 |
| 2 | Stepper motor 20 Kgcm | Stepper Motor Shaft length 100 mm Shaft diameter 12mm 20 Kgcm | 8 | nos | buyer2-dlljam | 90 |
| 3 | Stepper motor 40 Kgcm | Stepper Motor Shaft length 100 mm Shaft diameter 12 mm 40 Kg cm | 2 | nos | buyer2-dlljam | 90 |
| 4 | Stepper motor Controller 10 Kgcm | Stepper Motor Controller On off switch direction switch suitable to be driven from 0 to 35 RPM operating voltage 230V AC 50Hz and provision for DC 12V battery Supply Step angle 1.8 degree full step plus 5 percent non cumulative. 10Kg cm | 6 | nos | buyer2-dlljam | 90 |
| 5 | Stepper motor Controller 20 Kgcm | Stepper Motor Controller On off switch, direction switch, suitable to be driven from 0 to 35 RPM operating voltage 230V AC 50Hz and provision for DC 12V battery Supply, Step angle 1.8 degree full step plus 5 percent non cumulative. 20Kg cm | 8 | nos | buyer2-dlljam | 90 |
| 6 | Stepper motor Controller 40 Kgcm | Stepper Motor Controller On off switch direction switch suitable to be driven from 0 to 35 RPM operating voltage 230V AC 50Hz and provision for DC 12V battery Supply Step angle 1.8 degree full step plus 5 percent non cumulative. 40Kg cm | 2 | nos | buyer2-dlljam | 90 |
AI-Powered Bidder Prediction
Companies most likely to bid
Unlock Bidder Insights
AI predictions on likely bidders
Required Documents
1
Experience Criteria
2
Past Performance
3
Bidder Turnover
4
Certificate (Requested in ATC)
5
OEM Authorization Certificate
6
Additional Doc 1 (Requested in ATC)
7
Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
8
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Download FREE!
Access all tender documents at no cost
Documents 5
GeM-Bidding-8086639.pdf
Main Document
BOQ Document
BOQ
BOQ Document
BOQ
Buyer uploaded ATC document
ATC
GEM General Terms and Conditions Document
GEM_GENERAL_TERMS_AND_CONDITIONS
GeM-Bidding-8086639.pdf
Main Document
BOQ Document
BOQ
BOQ Document
BOQ
Buyer uploaded ATC document
ATC
GEM General Terms and Conditions Document
GEM_GENERAL_TERMS_AND_CONDITIONS