GEM

Procurement Opportunity: Stepper motor 10 Kgcm,Stepper motor 20 Kgcm,Stepper motor 40 Kgcm,Stepper motor Controller 10 Kgcm, in JAMNAGAR, GUJARAT

Posted

14 Jul 2025, 05:40 pm

Deadline

05 Aug 2025, 11:00 am

EMD

₹11,614

Value

₹5,80,678

Progress

Issue14 Jul 2025, 05:40 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

32

Category

Stepper motor 10 Kgcm

Bid Type

Two Packet Bid

Categories 2

Directorate General Of Lighthouses And Lightships has released a public tender for Stepper motor 10 Kgcm, Stepper motor 20 Kgcm, Stepper motor 40 Kgcm, Stepper motor Controller 10 Kgcm, Stepper motor Controller 20 Kgcm, Stepper motor Controller 40 Kgcm in JAMNAGAR, GUJARAT. Quantity: 32. Submission Deadline: 05-08-2025 11: 00: 00. Download documents and apply online.

Bill of Quantities (BOQ) 6 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 Stepper motor 10 Kgcm Stepper Motor Shaft length 100 mm Shaft diameter 10 mm 10 Kgcm 6 nos buyer2-dlljam 90
2 Stepper motor 20 Kgcm Stepper Motor Shaft length 100 mm Shaft diameter 12mm 20 Kgcm 8 nos buyer2-dlljam 90
3 Stepper motor 40 Kgcm Stepper Motor Shaft length 100 mm Shaft diameter 12 mm 40 Kg cm 2 nos buyer2-dlljam 90
4 Stepper motor Controller 10 Kgcm Stepper Motor Controller On off switch direction switch suitable to be driven from 0 to 35 RPM operating voltage 230V AC 50Hz and provision for DC 12V battery Supply Step angle 1.8 degree full step plus 5 percent non cumulative. 10Kg cm 6 nos buyer2-dlljam 90
5 Stepper motor Controller 20 Kgcm Stepper Motor Controller On off switch, direction switch, suitable to be driven from 0 to 35 RPM operating voltage 230V AC 50Hz and provision for DC 12V battery Supply, Step angle 1.8 degree full step plus 5 percent non cumulative. 20Kg cm 8 nos buyer2-dlljam 90
6 Stepper motor Controller 40 Kgcm Stepper Motor Controller On off switch direction switch suitable to be driven from 0 to 35 RPM operating voltage 230V AC 50Hz and provision for DC 12V battery Supply Step angle 1.8 degree full step plus 5 percent non cumulative. 40Kg cm 2 nos buyer2-dlljam 90

AI-Powered Bidder Prediction

Companies most likely to bid

Unlock Bidder Insights

AI predictions on likely bidders

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

Additional Doc 1 (Requested in ATC)

7

Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer