Tender Overview
The procurement by Aravali Power Company Private Limited in Jhajjar, Haryana requests supply of a Buchholz Relay for a 3-phase transformer rated at 80 MVA, 132/11.5-11.5 kV. The scope is limited to the supply of goods with the option clause allowing up to 25% quantity variation at contracted rates, and delivery timing anchored to the original delivery period with adjustments as described. The bidder must align with source-standardization requirements (NTPC S-025 2025) and bid via GeM with a single authorized dealer if applicable. This opportunity emphasizes compliance with transformer field device standards and strict authorization rules. The tenderโs unique dimension lies in the mandatory source-standardization pathway and the quantity-flexible delivery framework, demanding precise vendor qualification and rapid ramp-up capabilities.
Technical Specifications & Requirements
- Product: Buchholz Relay for Transformer Field Devices in the specified rating and configuration.
- Standards/Compliance: NTPC Source Standardisation S-025 (2025); bidder must be a source-standardization vendor; direct participation preferred; single dealer authorization required if using an authorized dealer; bid-specific authorization is mandatory.
- Delivery/Scope: Supply of Goods only; inclusive pricing; delivery period defined by original delivery window with potential extension as per option clause; minimum 30-day extension logic when quantities increase.
- Documentation: Bid must include PAN Card, GSTIN, Cancelled Cheque, EFT Mandate; GST will be reimbursed per actuals or applicable rates, whichever is lower.
Terms, Conditions & Eligibility
- EMD/Financials: Not disclosed in data; ensure submission of standard bid security as applicable by GeM terms.
- GST: Bidder bears GST applicability; GST rate adjustments per actuals or statutory rates.
- Scope of Supply: Only supply; no installation or commissioning included.
- Authorizations: If participating via Dealer, Bid Specific Authorization is required; only one dealer permitted per bid; general authorizations rejected.
- Delivery Terms: Delivery period linked to last date of original order; extension calculations follow (Additional time = (Increased quantity / Original quantity) ร Original delivery period) with a 30-day minimum.
