Tender Overview
The Indian Navy, Department of Military Affairs, seeks to procure a suite of seven kitchen and food service appliances, including 4 Door Reach-In Vertical Freezer, 4 Door Reach-In Vertical Refrigerator, Vegetable Cutting Machine, Potato Peeler, Heavy Duty Mixer Grinder, Induction Gridle, and an Induction Operated SS Tilting Boiling Kettle 80 Ltr for INS Beas, Kochi installation. The contract requires Detailed Design Drawings within 5 days of award and approval by the buyer prior to fabrication, with delivery adjusted for any drawing approval delays. The BoQ lists seven items across a single project scope with no explicit unit quantities in the data. The purchaser mandates OEM authorization where applicable and installation by OEM-certified resources. 2+ years of government/Govt PSU supply experience is mandatory. Bidders must provide data sheets and GST/CIN compliance, and ensure product lifecycle viability.
Technical Specifications & Requirements
- Product categories: 4 Door Reach-In Freezer, 4 Door Reach-In Refrigerator, Vegetable Cutting Machine, Potato Peeler, Heavy Duty Mixer Grinder, Induction Gridle, Induction Operated 80 Ltr Tilting Kettle
- Delivery location: INS Beas, C/o Cochin Shipyard Ltd, Ravipuram, Kochi, Ernakulam, Kerala
- Key process requirements: Detailed Design Drawings due within 5 days of award; modification list provided within 5 days; supply aligned to approved drawings
- Installation/commissioning: To be performed by OEM/OEM-certified resources or authorized reseller
- Experience: Minimum 2 years regular government/PSU supply of similar category products
- Documentation: Data Sheet, GSTIN, PAN, cancelled cheque, EFT mandate; OEM authorization if applicable
- Compliance: Data sheets must match offered specifications; GST handling as per actuals up to quoted GST %
Terms & Eligibility
- EMD/financial security: Not specified in data; bidders must submit it as per buyer terms
- Payment terms: GST reimbursement on actuals; details per terms; delivery/installation timeline linked to drawing approvals
- Delivery timeline: Refixed if drawing approvals are delayed; installation by OEM resources
- Eligibility: No liquidation or bankruptcy; provide undertaking; 2+ years govt/PSU supply history; manufacturer authorization where required
