Tender Overview
Bharat Heavy Electricals Limited (BHEL), operating under the Department of Heavy Industry, invites bids for the Supply of Spares for Vapour Absorption Machine (VAM) for AC system at Visakhapatnam, Andhra Pradesh 530001. The tender scope covers parts required to support VAM-based air conditioning systems; quantities and total value are not disclosed in the provided data. The procurement emphasizes compliance with Buyer Added Terms and ATC, with a notable quantity flexibility up to 25% of bid/contracted quantities. This opportunity targets suppliers capable of timely delivery and seamless post-sale support within BHELโs established inspection framework.
Technical Specifications & Requirements
- Product: Spare parts for Vapour Absorption Machine (VAM) used in AC systems; no explicit part-by-part specifications are provided in the data.
- Quantity/Value: Not disclosed; quantity flexibility up to 25% of bid/contracted quantity is allowed.
- Inspection: Pre-dispatch inspection at seller premises (if selected) by BHEL BHEL TPIA; Post Receipt Inspection at the consignee site by SITE ENGINEER.
- Delivery: Delivery period calculated with reference to the original delivery period; minimum extension time is 30 days; option clause may extend delivery within contract limits.
- ATC: Bidder must follow Buyer Added Bid Specific ATC terms as outlined in the NIT document.
Terms, Conditions & Eligibility
- Option Clause: Purchaser may increase/decrease quantity by up to 25% at contract, with proportionate delivery time.
- Delivery Window: Additional time calculation: (Increased quantity รท Original quantity) ร Original delivery period; minimum 30 days; extension may occur within original delivery period.
- Inspection Agencies: Pre-dispatch by BHEL/BHEL TPIA or SITE ENGINEER for post-receipt.
- ATC Compliance: Bidders must adhere to the Buyer Added Bid Specific ATC; ensure bid alignment with localized terms.
- EMD/Payment/GST/other documents: Not specified in provided data; bidders should refer to tender terms for exact submission requirements.