Tender Overview
The Indian Army, Department Of Military Affairs, seeks execution of multiple civil works at Pune, Maharashtra (PIN 410301). Scope includes excavation for side foundation (3 cm x 50 cm x 44 m), brick block masonry for foundation walls/plinth, MS square tube framing for pillars, 46ft x 25ft roof framing, pre-coated roof sheets with tapping screws, and cement concrete plastering with 20–25 mm aggregate. Estimated value is ₹350,000. Deliverables span structural framing, roofing, plastering, and foundation components, with a compact project footprint covering 14 m x 8 m area and 01.10 m height considerations. A key differentiator is the integration of mixed construction activities under a single contract with 25% quantity variation rights. Tender involves government procurement for a defense facility in Pune, emphasizing field-ready workmanship and site-specific coordination.
Technical Specifications & Requirements
- Scope includes: excavation for side foundation; brick block masonry; MS square tube framing (75x75 mm pillars, 50x50 mm x 16 gauge rafters); pre-coated roof sheets (0.5 cm thickness) fixed with tapping screws; plastering and cement concrete work using 20–25 mm aggregate; area 14 m × 8 m; plinth level work; roof sheet dimension 46 ft × 25 ft.
- Quantities/Area: 14 m × 8 m footprint; plinth and foundation components; detailed itemization not provided in BOQ.
- Materials & methods: structural MS framing, corrugated roof sheets, 20–25 mm aggregate concrete, smooth finish plaster.
- Delivery considerations: alignment with 25% quantity variation and extended delivery as per option clause; start/end dates not specified.
- Compliance expectations: basic construction codes; no explicit IS/ISO standards listed in data.
Terms, Conditions & Eligibility
- EMD: not disclosed in data; bidders should verify in ATC document.
- Variation clause: purchaser may increase/decrease quantity up to 25% at contract time and during currency; extended delivery period calculated as (additional/ original) × original delivery days, minimum 30 days.
- Delivery timeline: last date of original delivery order determines start of option-driven extension; total additional time rules apply.
- Submission docs: standard bidder documents including GST, PAN, experience, financials; OEM authorizations may be required per ATC; ensure compliance with Buyer Added Terms.