Tender Overview
The Indian Army invites bids for a multi-item procurement package covering automotive components including a Wiper Motor 24 Inch, Bonnet Cable for Tata 2.5 Ton, Clutch Master Cylinder for Tata 2.5 Ton, Gear Box Plunger for ALS, Solenoid Switch 12V for Tata 2.5 Ton, Regulator for RE, Self Bush Set for ALS, Speedo Cable for Tata 2.5 Ton, and Relay for Tata Safari. Estimated value is ₹9,020.00 with 9 BOQ items and unspecified quantities. Location: BARAMULLA, JAMMU & KASHMIR - 193101. The buyer reserves a 25% quantity variation during and after contract formation. No start/end dates or explicit technical specs are provided in the data.
The tender emphasizes standard vendor documentation and a flexible delivery window linked to the original delivery period, with calculation for extended time. This involves standard vendor code creation steps and specific certificates to be uploaded. The procurement aims to equip military vehicles with OEM Tata and ALS-compatible parts, ensuring compatibility with existing Tata 2.5 Ton platforms and auxiliary safety systems.
Technical Specifications & Requirements
- Product names from the BOQ: Wiper Motor 24 Inch, Bonnet Cable (Tata 2.5 Ton), Clutch Master Cylinder (Tata 2.5 Ton), Gear Box Plunger (ALS), Solenoid Switch 12V (Tata 2.5 Ton), Regulator (RE), Self Bush Set (ALS), Speedo Cable (Tata 2.5 Ton), Relay (Tata Safari).
- No explicit performance metrics, dimensional drawings, or material standards are disclosed.
- The item scope suggests automotive electrical/mechanical components requiring OEM compatibility with Tata and ALS equipment.
- Estimated value signals a small- to mid-scale supply contract; no EMD amount is shown.
- Documentation must include PAN, GSTIN, Cancelled Cheque, and EFT Mandate per bid terms.
- Delivery timing is contingent on the original delivery period, with extension rules outlined in the option clause.
Terms, Conditions & Eligibility
- EMD: Not specified in the provided terms; bidders must review ATC/Corrigendum for any security deposit requirements.
- Delivery: Delivery period begins after the last date of the original order; extended time calculated as (Increased quantity ÷ Original quantity) × Original period, minimum 30 days.
- Payment: Terms not detailed in data; bidders should verify in the final bid document and any EFT terms.
- Documents: Required uploads include PAN, GSTIN, Cancelled Cheque, EFT Mandate; ensure all certificates listed in the bid document are attached.
- Option Clause: Quantity may vary up to 25% during/after contract at contracted rates; delivery period adjustments follow the same logic.
- Compliance: Failure to upload required certificates/documents may lead to rejection. Compliance with ATC and Corrigendum is mandatory.
