Tender Overview
The Indian Army, Department Of Military Affairs, invites bids for a broad range of mechanical and hydraulic components including NOZZLE, OIL FILTER, FUEL FILTER, HYDROLIC FILTER, HOSE, BRAKE LINER, OIL SEAL HYDROLIC, PUMP ELEMENT, PIPE ASSY, WHEEL BRG INNER/OUTER, CYL HEAD GASKET, HAND BRAKE CABLE, and RING SET. The BOQ lists 15 items with unspecified quantities, suggesting a multi-line supply contract. The vendor base target is suppliers capable of bulk provisioning and conforming to contract terms. A key differentiator is the option clause allowing up to 25% quantity variation at contracted rates, with delivery timelines linked to the last delivery order date. The contract includes advance sample approval, material test certificates, and GST handling considerations. Unique aspects include sample-based approval, supplier finance implications, and post-award modification provisions.
Technical Specifications & Requirements
- Scope covers a diversified set of mechanical/hydraulic components: nozzles, oil/fuel filters, hydraulic filters, hoses, wheel bearings, cylinder head gaskets, hand brake cables, ring sets, kero heater wicks, and related pipe assemblies.
- Notably, no explicit performance metrics or standards are published in the tender body. Required documentation includes a Material Test Certificate with supply and compliance by the buyer’s inspection. The terms permit sample-based approvals, possible modifications, and risk of contract termination for non-conformity.
- The Buyer reserves quantity-flexibility (±25%), and delivery timeframes adjust proportionally with the order, subject to a minimum 30 days extension. GST is the supplier’s responsibility, with reimbursement linked to actuals or applicable rates.
Terms, Conditions & Eligibility
- EMD: Not specified in the published terms; bidders should verify at bid stage.
- Delivery: Extended delivery timeframe can be calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with minimum 30 days.
- Payment: GST payable by bidder; reimbursement as per actuals or applicable rates up to quoted GST percentage.
- Samples: Advance sample approval required within 5 days of award; modifications communicated within 5 days; bulk supply must mirror approved sample.
- Documentation: Material Test Certificate to accompany supply; adherence to contract specifications; potential for contract termination if major deviations are found.
- Compliance: No explicit IS/ISO standards in the data; bidders should assume standard defense procurement due diligence and certification as per defense norms.
