Tender Overview
The Eastern Railway, under Indian Railways, invites bids for Supply Installation Testing and Commissioning of control room furniture in Malda, West Bengal 732101. The scope encompasses furniture supply and on-site installation at SSE/WORKS, with performance and post-installation support included. Bidders should address scope expansion via option clauses, including up to 25% quantity increases at contracted rates, with delivery timelines tied to the original delivery period. The tender emphasizes OEM eligibility, site survey validation, and layout planning as foundational commitments for a compliant bid.
Technical Specifications & Requirements
- Product category: control room furniture capable of integrated installation (layout plan required).
- Key documentation: Site survey report with consignee signature; Detailed control room furniture layout; NTH/NABL certificate; Manufacturer Test Certificate; Technical data sheet.
- OEM credentials: Profit-making status in last 5 years (CA certificate with UDIN); demonstrated Govt/PSU credential in last 5 years; authorized dealer/reseller documentation if applicable.
- Service readiness: Dedicated toll-free service number and explicit escalation matrix for post-installation support.
- Compliance: Item specifications to follow attached documents; IS/NABL certification where applicable; product must meet standard documentation.
- Delivery & installation: Supply, installation, testing and commissioning at the Malda location; installation address: SSE/WORKS, EASTERN RAILWAY, JHALJHALIA, Malda-732102.
Terms & Eligibility
- Delivery window: option to extend delivery time as per quantity variation (minimum 30 days, calculated formula).
- At least 5-year window of vendor profitability and government/PSU credentials.
- Mandatory documents: site survey report, detailed furniture layout, OEM authorization (if applicable), NTH/NABL and technical data sheets.
- Service support: dedicated toll-free number and escalation matrix required from bidder/OEM.
- Compliance: submission must reflect supply-installation-testing-commissioning scope with all cost components included.