Tender Overview
Uttar Pradesh Power Corporation Limited (UPPCL) invites bids for Repair, Maintenance and Installation of Plant/Systems/Equipments related to Sub Station; Switchyard at Bareilly, Uttar Pradesh (243001). Estimated value is ₹154,875.00. The scope references service-provider engagement for works at the energy department facility, with a unique variation clause allowing up to 25% change in quantity or duration at contract issue and post-award. The procurement emphasizes service delivery at the Bareilly facility with execution aligned to the GeM terms. This tender differentiator lies in the flexible quantity/duration adjustment and the requirement for the service provider to manage staff salaries in-house prior to invoicing. Unique ATC terms require submission of FDR as security instead of a traditional PBG, with the original FDR delivery within 15 days of award.
Technical Specifications & Requirements
- No technical specifications are listed in the available data; the BOQ contains 0 items.
- Notwithstanding, bidders should prepare to demonstrate capability for repair, maintenance and installation activities specific to substation equipment and plant systems, with emphasis on compliance and timely deployment at Bareilly site.
- The terms indicate a need to upload all required certificates and documents to avoid rejection, and to align with the ATC’s guidance on FDR-based security.
- Important considerations include the potential need for staff payroll compliance (PF/ESI) and the ability to support a 25% quantity/duration adjustment window during contract issuance.
Terms, Conditions & Eligibility
- EMD amount not specified; bidders should verify required security as per ATC and GeM terms.
- Payment terms require the service provider to pay contracted staff salaries upfront and claim reimbursement from the buyer with statutory documentation (PF, ESIC, bank statements).
- Security deposit may be furnished via Fixed Deposit Receipt (FDR) in favor of the seller’s account, with withdrawal restrictions clearly certified by the bank; delivery of hard copy within 15 days of award is mandatory.
- Failure to upload certificates or documents requested in the Bid document/ATC may lead to bid rejection.
- The contract allows a 25% adjustment in quantity or duration; acceptance of revised scope is mandatory once the contract is issued.