The Indian Air Force (Department of Military Affairs) invites bids for the Upgradation of Existing Cemented Lawn Tennis Court to Synthetic Layering. Scope includes Breaking old base and applying 70mm PCC and installing a synthetic surface with 5-year warranty. Key ATC terms require a minimum 3 yearsβ relevant experience, and a warranty-based service regime with defect rectification timelines. The contract includes supply, installation, testing, and commissioning, with inspection by a designated body prior to acceptance. This procurement targets defense infrastructure enhancements with specified workmanship and post-warranty support expectations.
Technical Specifications & Requirements
- Project scope: Supply, Installation, Testing and Commissioning of the tennis court upgrade from cemented base to synthetic surface.
- Base work: Breaking old base and applying 70mm PCC (Plain Cement Concrete).
- Warranty: Minimum 5 years for the synthetic surface and ground marking.
- Service obligations: Defect rectification within 15 days of notification; penalties of 0.5% per week of unit price for delays; cumulative penalty cap at 10% of total contract value.
- Inspection: Pre-dispatch and post-receipt inspections by a Board of Officers as per ATC terms.
- Experience requirement: Bidders must demonstrate minimum 3 years in similar work.
- Delivery/execution: Timelines tied to delivery orders with option for extension under contract terms.
- Schedule: No BOQ items listed; scope emphasizes site upgrade and surface modernization.
Terms, Conditions & Eligibility
- EMD/Performance security: Not specified in the data; bidders should infer from standard ATC practice.
- Eligibility: Minimum 3 yearsβ experience in similar tennis court/upgradation projects; ability to perform PCC work and synthetic surface installation.
- Warranty: 5-year warranty on synthetic surface; performance penalties for delays up to 10% of contract value.
- Payment terms: Not specified in the data; subject to contract terms and security deposit arrangements.
- Inspection: Board of Officers to conduct post-acceptance inspections; pre-dispatch inspection may be applicable.
- Option clause: Quantity flexibility up to 25% during contract and delivery period extensions as per formula.
- Compliance: Contractors must adhere to all ATC conditions and deliver/install/commission per standard procedures.