Tender Overview
The opportunity is issued by the Indian Army under the Department Of Military Affairs for the procurement of Air Conditioner System equipment. The tender does not disclose the exact quantity, location, or estimated value. A key differentiator is the unilateral option clause permitting up to 25% quantity variation with corresponding delivery extensions. The contract contemplates both pre-dispatch and post-delivery inspection processes and allows for independent inspection bodies, including third-party options, to mitigate risk during acceptance. Unique terms include delivery timing adjustments based on order quantities and an inspection regime that may allocate inspection costs, with a potential 0% charge to the buyerβs inspection clause. This tender emphasizes flexible quantity management, robust inspection protocols, and contractor compliance with delivery milestones.
Technical Specifications & Requirements
- Category: Air Conditioner System
- Quantity flexibility: Purchaser may increase/decrease quantity up to 25% of bid quantity at contract placement and during currency at contracted rates.
- Delivery timeline logic: Delivery period starts from the last date of the original delivery order; extended time computed as (additional quantity Γ· original quantity) Γ original delivery period, with a minimum of 30 days.
- Inspection regime: Pre-dispatch inspection at seller premises (if ATC selects) or post-receipt inspection at consignee site; inspection may be conducted by the buyerβs Inspection Agency or an empanelled third party; costs may be recovered if non-conforming.
- Inspection cost: Noted as potentially 0% by the buyer for inspection charges under contractual provisions.
- Quality assurance: Independent inspections may be used to ensure conformance to contractual requirements; supplier must accommodate inspection scheduling and cost sharing when applicable.
Terms, Conditions & Eligibility
- EMD/Security: Not disclosed in the available terms; bidders should assume standard EMD as per government procurement norms.
- Delivery terms: Flexible delivery windows tied to option clause; original delivery period may be extended proportionally with minimum 30 days.
- Inspection: Mandatory conformity checks by approved inspection bodies; cost allocation to be determined by contract clause.
- Payment terms: Not specified in the available terms; bidders should prepare for typical government payment schedules (milestone-based or post-delivery) as per policy.
- Documentation: Required submission likely includes GST, PAN, and technical/commercial bid documentation; OEM authorizations may be required depending on ATC selections.
- Warranty/penalties: Not specified in the current terms; bidders should confirm warranty terms and LD provisions in the final ATC.
