Tender Overview
South Western Railway invites bids for a 3/4" drive cordless impact wrench kit, with two batteries and a charger, delivering a minimum forward torque of 1300 Nm. Brand options include Stanley, DeWalt, Ingersoll Rand, Makita, Bosch or similar. The kit specification supports Li‑ion batteries, four speed control, and a battery capacity of 100 Wh. Scope states Only supply of Goods, with a focus on on‑site serviceability and timely delivery. Estimated value is not disclosed; the procurement targets reliable, durable tools for rail maintenance, with emphasis on warranty and post‑sale support.
Technical Specifications & Requirements
- Item: 3/4" square drive cordless impact wrench kit with 02 batteries, a charger
- Minimum forward torque: 1300 Nm
- Battery type: Li‑ion; Power capacity: 100 Wh
- No load speed: up to 1800 RPM (max); multiple speed settings (0–1800/1400/1150/950 RPM)
- Speed selection: 4‑speed capability
- Drive/bolt range: supports M10 to M27 high‑strength bolts
- Warranty: terms unspecified in detail; service level commitments required
- Brands: Stanley, DeWalt, Ingersoll Rand, Makita, Bosch or similar (OEM authorization advisable)
- Service: functional service centre in the consignee state; dedicated service line; penalties for delayed warranty service
Terms, Conditions & Eligibility
- Scope: Supply of goods only; no installation services
- Turnover: bidder’s average annual turnover over the last three financial years must meet the bid document threshold (audited balance sheets or CA certificate)
- Service centres: must exist in the state of each consignee location or be established within 30 days of award; payment contingent on evidence
- Warranty servicing: rectification within 5 days; penalties at 0.5% of unit price per week; maximum penalty 10% of contract value; recovery through PBG or DFAR as applicable
- Documentation: GST registration, PAN, experience certificates, financial statements, EMD, OEM authorizations, technical compliance documents
- Delivery: timeframes aligned with tender terms; penalties for delays if specified in contract
- Payment terms: as per government norms; penalties and performance bonds may apply for non‑conformance
