Indian Army Department of Military Affairs ASSY OIL FILTER, BELT WATER PUMP & Armature Assembly Procurement 2025
Indian Army
FAIZABAD, UTTAR PRADESH
Bid Publish Date
25-Oct-2025, 4:20 pm
Bid End Date
04-Nov-2025, 5:00 pm
Location
Progress
Quantity
17
The Indian Army, Department Of Military Affairs, invites bids for a bundle of engine components including Water Separator, Oil Filter, Accelerator Cable, Hydraulic Hose, Tie Rod Ends, O Ring Set, Hand Primer Pump, Field Coil, Solenoid Switch, Brush Plate Assembly and Armature Assembly. The BOQ comprises 12 items with no specified quantities in the data provided. The buyer reserves a 25% quantity variation both before and during contract execution, at contracted rates. Delivery terms mandate rapid fulfillment, with ATC specifying 24-hour delivery and a 30-day payment window after receipt of serviceable stores. A sample submission and specification certificate are mandatory. Replacement policy is 30 days; inspections occur at the consignee location.
Product/service names: Water Separator, Oil Filter, Accelerator Cable, Hydraulic Hose, Tie Rod Ends RH/LH, O Ring Set, Hand Primer Pump, Field Coil, Solenoid Switch, Brush Plate Assembly, Armature Assembly
Quantities/values: 12 items in BOQ; exact quantities not disclosed
Delivery: 24 hours delivery as per ATC; replacement policy 30 days
Compliance: Strict conformity to buyer specifications with sample submission required
Documentation: Upload Specification certificate at bid submission; inspection at consignee
Quantity variation up to 25% during contract at contracted rates
Delivery window begins after original delivery order; extended period governed by option clause
30-day payment term after receipt of serviceable stores; 24-hour delivery requirement
Payment to be made within 30 days after successfully receipt of store in serviceable condition.
Items must be delivered within 24 hours; option to modify delivery based on quantity adjustments up to 25%.
Not explicitly stated in data; implied penalties may apply for non-conformance or delayed delivery per ATC terms.
Must comply with 25% quantity variation and related delivery timelines under option clause
Upload Specification certificate and show sample before bid participation
Adhere to 30-day payment terms and 24-hour delivery requirement
Tender Category
Goods
Bid To RA
No
Item Category
Water Saprator , Oil Filter , Accelerator Cable , Hydraulic Hose , Tie Rod End RH , Tie Rod End LH , O Ring Set , Hand Primer Pump , Field Coil , Solenoid Switch , Brush Plate Assy , Armature Assy
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
FAIZABAD, UTTAR PRADESH
Indian Army
SONITPUR, ASSAM
Indian Army
LEH, JAMMU & KASHMIR
Indian Army
FIROZPUR, PUNJAB
Indian Army
Tender Results
Loading results...
Water Saprator
for JCB
Oil Filter
for JCB
Accelerator Cable
for JCB
Hydraulic Hose
for JCB
Tie Rod End RH
for JCB
Tie Rod End LH
for JCB
O Ring Set
for JCB
Hand Primer Pump
for JCB
Field Coil
for D 80
Solenoid Switch
for D 80
Brush Plate Assy
for D 80
Armature Assy
for D 80
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Water Saprator | for JCB | 2 | nos | 204@fwc2 | 15 | |
| 2 | Oil Filter | for JCB | 2 | nos | 204@fwc2 | 15 | |
| 3 | Accelerator Cable | for JCB | 2 | nos | 204@fwc2 | 15 | |
| 4 | Hydraulic Hose | for JCB | 2 | nos | 204@fwc2 | 15 | |
| 5 | Tie Rod End RH | for JCB | 1 | nos | 204@fwc2 | 15 | |
| 6 | Tie Rod End LH | for JCB | 1 | nos | 204@fwc2 | 15 | |
| 7 | O Ring Set | for JCB | 2 | nos | 204@fwc2 | 15 | |
| 8 | Hand Primer Pump | for JCB | 1 | nos | 204@fwc2 | 15 | |
| 9 | Field Coil | for D 80 | 1 | nos | 204@fwc2 | 15 | |
| 10 | Solenoid Switch | for D 80 | 1 | nos | 204@fwc2 | 15 | |
| 11 | Brush Plate Assy | for D 80 | 1 | nos | 204@fwc2 | 15 | |
| 12 | Armature Assy | for D 80 | 1 | nos | 204@fwc2 | 15 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | MAHAKAL TRADERS(MSE)( MSE Social Category:General ) Under PMA | Item Categories : Water Saprator,Oil Filter,Accelerator Cable,Hydraulic Hose,Tie Rod End RH,Tie Rod End LH,O Ring Set | |
| L2 | KAMLESH TRADING CO (MSE)( MSE Social Category:General ) Under PMA | Item Categories : Water Saprator,Oil Filter,Accelerator Cable,Hydraulic Hose,Tie Rod End RH,Tie Rod End LH,O Ring Set | |
| L3 | SWATI ENTERPRISE (MSE)( MSE Social Category:General ) Under PMA | Item Categories : Water Saprator,Oil Filter,Accelerator Cable,Hydraulic Hose,Tie Rod End RH,Tie Rod End LH,O Ring Set |
Key insights about SIKKIM tender market
Bidders should prepare the specification certificate, upload it with the bid, and show a sample prior to submission. Ensure 24-hour delivery capability, 30-day payment terms, and readiness to accept up to 25% quantity variation at contract. Submissions must align with ATC clauses and consignee inspection requirements.
Required documents include GST registration, PAN, prior experience certificates, financial statements, EMD details, technical compliance certificates, OEM authorizations if applicable, and the Specification certificate. Ensure sample availability and adherence to 24-hour delivery terms and 30-day payment terms.
Delivery must occur within 24 hours of order under ATC. The option clause allows up to 25% quantity variation during contract, with delivery timelines adjusted accordingly. Replacements are required within 30 days, and inspection occurs at the consignee location.
Specification certificate must be uploaded; items must conform strictly to buyer specifications. While explicit standards are not listed, compliance with the buyer's exact specs is mandatory, and deviations can lead to rejection or demand for replacement.
The purchaser may increase or decrease the quantity up to 25% at the contracted rate either at contract award or during currency. Delivery time extensions are calculated as (Increase/Original) × Original delivery period, with a minimum of 30 days.
Payment terms specify settlement within 30 days after the successful receipt of stores in serviceable condition. Ensure proper documentation of delivery acceptance and conformity with the sample and certificate requirements to avoid payment delays.
Bidders must show a physical sample prior to bid participation. The sample must reflect the buyer’s specifications, with the Specification certificate uploaded during bid submission. Non-submission may lead to bid rejection.
Inspection is conducted by the Consignee’s BOO at the consignee’s location. Suppliers must provide the required documentation and ensure items meet exact specifications to pass inspection and enable timely payment.
Indian Army
📍 JHANSI, UTTAR PRADESH
Indian Army
📍 JAMMU, JAMMU & KASHMIR
Indian Army
📍 JAMMU, JAMMU & KASHMIR
Indian Army
📍 JALANDHAR, PUNJAB
Indian Army
📍 ALWAR, RAJASTHAN
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS