Nuclear Power Corporation Of India Limited announces a tender for Distribution Transformer, 3 Phase, 11 kV > 200 KVA up to and Including 2500 KVA (Q3) in CHITTORGARH, RAJASTHAN. Quantity: 1. Submission Deadline: 13-11-2025 10: 00: 00. Last date to apply is approaching fast!
    GEM   
 Government Tender Published for Distribution Transformer, 3 Phase, 11 kV > 200 KVA up to and Including 2500 KVA in CHITTORGARH, RAJASTHAN
Posted
23 Oct 2025, 02:43 pm
Deadline
13 Nov 2025, 10:00 am
EMD
₹44,020
Location
Progress
Issue23 Oct 2025, 02:43 pm
AwardPending
Quantity
1
Bid Type
Two Packet Bid
   
Categories
 4  
     
Technical Specifications
 1 Item  
 Item #1 Details
View Catalog| Category | Specification | Requirement | 
|---|---|---|
| STANDARDS | Energy efficiency level | 2 | 
| STANDARDS | BEE Star Rating | 2 | 
| STANDARDS | Installation, Testing and Demonstration | No | 
| STANDARDS | Minimum warranty on receipt of stores (in Months) | 30, 42, 54, 66, 78 | 
| STANDARDS | Minimum warranty from the date of installation (in Months) | 24, 36, 48, 60, 72 | 
| RATINGS | Nominal system voltage, HV ( in kV) | 11 | 
| RATINGS | Nominal system voltage, LV ( in V) | 415 | 
| RATINGS | Standard ratings (in kVA) | 1000 | 
| RATINGS | Minimum basic insulation level (in kVP) | 75 | 
| RATINGS | No load voltage ratios (in Volts) | 11000/433-250 | 
| RATINGS | Highest system voltage for equipment (in kV) | 12 | 
| RATINGS | Rated lightning impulse withstand voltage (in kV Peak) (Refer IS:1180 (Part 1):2014 Annex-D) | 75 | 
| CONSTRUCTION | Core mateial | CRGO (as per IS:3024 latest) | 
| CONSTRUCTION | Conductor (Winding) material | Copper | 
| CONSTRUCTION | Vector Group | Dyn-11 | 
| CONSTRUCTION | Type of Mounting | Ground Mounted | 
| CONSTRUCTION | Noise level at rated voltage and freqeuncy, Maximum (in dB) | 45, 48, 51, 55 | 
| TRANSFORMER TANK | Transformer tank cover construction | Non-sealed, Bolted | 
| TRANSFORMER TANK | Tank configuration with | With radiator fins | 
| TRANSFORMER TANK | Material of transformer tank | Mild Steel | 
| TRANSFORMER TANK | Minimum thickness of top and bottom material of transformer tank (in mm) | 5, 6, 7, 8, 9, 10 | 
| TRANSFORMER TANK | Minimum thickness of side material of transformer tank (in mm) | 3.15, 4, 4.5, 5, 6 | 
| TRANSFORMER TANK | Material of Bolts/Nuts/Wahers exposed to atmosphere | Stainless steel (for upto 12 mm size), Electro Galvanized (for above 12 mm size) | 
| TRANSFORMER TANK | Gaskets wherever used shall conform to | Type III (as per IS:11149) Type C (as per IS:4253 (Pt.2) | 
| TRANSFORMER TANK | Provision of conservator | Yes , for Non sealed type with Plain tank construction | 
| Painting | Type of painting on inside of tank (hint: Refer Table 12 of IS:1180 (Pt.1):2014) | Oil resistant paint | 
| Painting | Type of painting on External surface of tank (hint: Refer Table 12 of IS:1180 (Pt.1):2014) | Polyurethane (finish coat) | 
| TAP CHANGER | Winding tapped | HV | 
| TAP CHANGER | No. of positions (in Nos.) | 7 | 
| TAP CHANGER | Voltage variation | +5% to -15% in steps of 2.5% for variation of HV | 
| TERMINAL ARRANGEMENT | Transformer fitted with bushings of appropriate voltage and curent ratings on HV side | Yes. 3 Nos. (Conforming to IS:2099) | 
| TERMINAL ARRANGEMENT | Transformer fitted with bushings of appropriate voltage and curent ratings on LV side | Yes. 4 Nos. (Conforming to IS:7421) | 
| TERMINAL ARRANGEMENT | Suitable provision for adoption of cables of suitable size on LV side | Yes. For PVC/XLPE Cables | 
| TERMINAL ARRANGEMENT | Cable End Box on HV side | Yes, No | 
| TERMINAL ARRANGEMENT | Cable End Box on LV side | Yes | 
| MARKING | Material of rating plate | Anodized aluminium | 
| MARKING | Marking method on rating plate | Etching, Engraved, Stamped | 
| MARKING | Rating and terminal marking plates combined into one plate | Yes | 
| OPTIONAL FITTINGS | Suitable rating lightning arrestors | No | 
| OPTIONAL FITTINGS | Bird guard | No | 
| OPTIONAL FITTINGS | Terminal connectors | Yes, No | 
| OPTIONAL FITTINGS | Oil temperature indicator and widning temperature indicator | Yes, No | 
| OPTIONAL FITTINGS | Jacking pads | Yes for transformer above 1600 KVA, No, Yes | 
| OPTIONAL FITTINGS | Buchholz relay | Yes, NoMagnetic oil level gauge with low oil level alarm contact | 
| OPTIONAL FITTINGS | Magnetic oil level gauge with low oil level alarm contact | Yes for transformer above 1600, No, Yes | 
| OPTIONAL FITTINGS | Non return valve | Yes, No | 
| OPTIONAL FITTINGS | Protection relay for sealed type transformers for internal parameters that is pressure, temperature, oil level and gas detection | No | 
| OPTIONAL FITTINGS | Unidirectional flat rollers | Yes, No | 
| OPTIONAL FITTINGS | Drain cum sampling valve | Yes with steel plug (for transformers upto 500 KVA), No, Yes | 
| OPTIONAL FITTINGS | Self protection / disconnection devices | No | 
| OPTIONAL FITTINGS | Expulsion fuse as disconnection device | No | 
| SERVICE CONDITION | Maximum altitude | <5000 m | 
| TEST REPORTS & CERTIFICATIONS | Availability of type test reports to prove the confirmity of the specification from | Central Govt. Lab (Govt. Of India), NABL Accrediated, ILAC accrediated | 
| TEST REPORTS & CERTIFICATIONS | Agreed for stage Inspection as required by buyer | Yes | 
| SPECIAL TEST REPORTS | Availability of test report for Determination of sound level test | Yes, No | 
| SPECIAL TEST REPORTS | Availability of test report for short circuit withstand test | Yes, No | 
| SPECIAL TEST REPORTS | Availability of test report for No load current at 112.5 % Voltage | Yes, No | 
| SPECIAL TEST REPORTS | Availability of test report for Paint adhesion test | Yes for 1 No., No, Yes for all units | 
| SPECIAL TEST REPORTS | BDV and moisture content of oil in the transformer | Yes for 1 No., No, Yes for all units | 
| SPECIAL TEST REPORTS | Other requirements | Losses and Impedance values as per Cl.7.8 and Table 6 of IS:1180 (Part 1):2014 latest, Limits of temeprature-rise as per Cl.7.10 of IS:1180 (Part 1):2014 latest | 
AI-Powered Bidder Prediction
Companies most likely to bid
Unlock Bidder Insights
AI predictions on likely bidders
Required Documents
1
Additional Doc 1 (Requested in ATC)
2
Additional Doc 2 (Requested in ATC)
3
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
4
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Download FREE!
Access all tender documents at no cost
    Documents  7  
 GeM-Bidding-8448433.pdf
Main Document
CATALOG-Specification-1
CATALOG Specification
Other Documents
OTHER
Other Documents
OTHER
Buyer uploaded ATC document
ATC
Buyer uploaded ATC document
ATC
GEM General Terms and Conditions Document
GEM_GENERAL_TERMS_AND_CONDITIONS
GeM-Bidding-8448433.pdf
Main Document
CATALOG-Specification-1
CATALOG Specification
Other Documents
OTHER
Other Documents
OTHER
Buyer uploaded ATC document
ATC
Buyer uploaded ATC document
ATC
GEM General Terms and Conditions Document
GEM_GENERAL_TERMS_AND_CONDITIONS
