Tender Overview
Organization: NLC Tamil Nadu Power Limited. Procurement: Barrel coupling, scope limited to supply of goods. Location: Tuticorin, Tamil Nadu 627713. Authorized bidder: Bids are invited exclusively from RKB International Pvt. Ltd. (OEM-referred distributor). Delivery: Timelines linked to original order with option to extend up to 25% quantity, minimum 30 days extension. Financials: EMD not disclosed in the excerpt; payment via online RTGS/Internet banking with PBG option. Inspection: Post-receipt inspection at consignment site by NTPL executives. Documentation: PAN, GSTIN, cancelled cheque, EFT mandate required with bid. The contract requires compliance with at least the stated delivery and payment mechanisms, and online security deposits. Unique point: Procurement exclusively channeled through the named authorized seller.
Technical Specifications & Requirements
- Scope of supply: Only supply of goods (Barrel coupling) to be delivered to NTPL/Tuticorin.
- Inspection: Post-receipt inspection at consignee site by NTPL executives; pre-dispatch inspection not applicable.
- EMD/PBG: Performance security may be submitted via RTGS/online banking; PBG also acceptable per GeM GTC; Bidder must upload online transfer proof within 15 days of award.
- Certificates & documents: Upload required certificates/documents as per Bid document/ATC; failure leads to rejection.
- ATC restriction: Bids accepted only from M/s. RKB International Pvt. Ltd (Authorized representative/distributor per OEM).
- Delivery terms: Clause allows quantity variation up to 25% during contract; delivery period aligned to last delivery order date with extensions as described.
Terms, Conditions & Eligibility
- Delivery extension rules: Up to 25% quantity increase, with time extension formula: (Increased quantity Ă· Original quantity) Ă— Original delivery period, minimum 30 days. Extension up to original delivery period possible.
- Scope: Bid price to include all cost components; strictly for supply of goods (no services).
- Payment terms: Online RTGS/Internet banking payment; contract requires Contractor to provide contract number and seller name in transfer details; upload proof within 15 days of award.
- Documents required: PAN, GSTIN, cancelled cheque, EFT mandate; ensure certificates/documents listed in Bid/ATC.
- Prejudice clause: Bids from other bidders will be summarily rejected per ATC clause.
- Delivery & inspection: Post-receipt inspection by NTPL executives; pre-dispatch inspection not applicable.
- Bonding: PBG accepted; RTGS payment option available.