Tender Overview
The procurement is for Rail Coach Factory Kapurthala to obtain Split Air Conditioner Including Green AC, Wall Mount Type (V2). The scope is limited to the supply of goods, with ISI marked units and a BIS license in the OEM name required. Post-receipt inspection will be conducted at the Rail Coach Factory Kapurthala site, ensuring conformity to lab test results. The tender emphasizes ISO 9001 certification for bidders or OEMs, and mandates submission of relevant certificates with the bid. This buy involves a focused requirement on air conditioning units suitable for rail coach environments, with quality control via material test certificates and supplier documentation. The unique aspect is the combination of ISI/BIS compliance, ISO 9001 certification, and on-site acceptance testing, underscoring stringent quality standards for rail applications.
Technical Specifications & Requirements
- Product category: Split Air Conditioners (Green AC), Wall Mount Type (V2)
- Key standards: ISI marked, BIS license in OEM name, ISO 9001 certified supplier
- Documentation: Material Test Certificate to accompany supply; upload of BIS/type test/approval certificates as prescribed
- Inspection: Post-receipt inspection at consignee site (Rail Coach Factory Kapurthala); pre-dispatch inspection not specified
- Acceptance criteria: Lab test results from buyer’s lab will determine acceptance; strict adherence to ISI/BIS/ISO requirements
- Delivery/Scope: Goods-only scope; no BOQ items available at this time; installation not explicitly stated
- Additional notes: Supplier must ensure ISI marked product and provide valid BIS license in OEM name for technical suitability
Terms, Conditions & Eligibility
- EMD/Deposit: Not explicitly specified in data; bidders must align with ATC/Bid document terms
- Certifications: ISO 9001 certification required; ISI marked product with BIS license in OEM name
- Documentation to submit: BIS license, type test certificate, approval certificates, other product-specific certificates; Material Test Certificate with supply
- Inspection/Acceptance: Post-receipt inspection by consignee; buyer lab will determine acceptance
- Scope of supply: Only supply of goods (no turnkey services); ISI/BIS/ISO compliance essential
- Quality control: Material Test Certificate and buyer lab verification are mandatory for acceptance
- Special note: Non-compliance with required certificates can lead to bid rejection; must upload all certificates with bid
