GEM

Armoured Vehicles Nigam Limited Tools Supply Tender 12 Types for Valve Body Machining Rajasthan 2025

Posted

25 Oct 2025, 11:39 am

Deadline

04 Nov 2025, 12:00 pm

EMD

₹19,078

Progress

Issue25 Oct 2025, 11:39 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

2

Bid Type

Two Packet Bid

Categories 7

Tender Overview

Armoured Vehicles Nigam Limited invites bids for the supply of set of tools (12 types) for machining of valve body as per drawing 765-10-17. This is a limited tender enquiry with eligibility restricted to established suppliers on the approved list. The bid includes an EMD of ₹19,078 and requires packing and marking compliance, along with a mandatory GeM Tech Compliance submission. Inspection will be conducted post receipt by the CGM/OFFMK representative. The contract scope is strictly supply of goods with no installation services, and the tender emphasizes proper transit packing to prevent damage and explicit marking of supplier details and manufacture date.

The procurement context centers on standardizing valve-body machining tooling for defence production needs, with emphasis on controlled procurement channels and compliance with GeM prerequisites. The limited supplier pool and mandatory compliance steps are key differentiators, while the absence of a BOQ suggests a fixed or pre-defined tooling set aligned to DRG 765-10-17.

Technical Specifications & Requirements

  • Scope: Supply of goods (set of tools) for machining of valve body as per DRG 765-10-17; 12 tool types expected to be covered.
  • EMD: ₹19,078 (bidders must furnish via prescribed mode).
  • Inspection: Post-receipt inspection by CGM/OFFMK; pre-dispatch not applicable.
  • GeM compliance: Mandatory download and submission of the GeM Tech Compliance form.
  • Packing & Marking: Proper transit packing, and marking with firm name, S.O. no., and month/year of manufacture.
  • GST: Bid pricing to consider applicable GST; bidder bears GST implications; reimbursement as actuals or applicable rates (whichever is lower).
  • Option Clause: Quantity may vary up to ±50% at contract award and extended period terms under the clause provided.
  • Delivery: Not explicitly specified; terms reference delivery timelines linked to option clause and original quantity.
  • ATC & Certification: Full compliance with buyer-specified terms and mandatory vendor-code creation documentation.

Terms, Conditions & Eligibility

  • EMD: ₹19,078
  • Eligibility: Bidders must be on the established supplier list; only listed suppliers permitted to participate.
  • Documents: PAN card, GSTIN, cancelled cheque, EFT mandate certified by bank (for vendor-code creation).
  • GST: GST applicability to be determined by bidder; reimbursement as per actuals or applicable rate up to quoted GST.
  • Delivery & Quantity: Option to increase/decrease quantity up to 50%; delivery period calculated from last date of original delivery order; minimum extension 30 days.
  • Payment: Not explicitly stated; payment terms aligned to GeM/ATC terms and post-inspection acceptance.
  • Inspection: Post-receipt inspection by CGM/OFFMK; pre-dispatch not applicable.
  • Packing/Marking: Required compliance as per tender; ensure clear marking and identification.
  • GeM Compliance: Mandatory submission of GeM Tech Compliance form; quotes without it may be rejected.
  • Packing/Transit: Ensure safe packing to avoid transit/storage damage.
  • Warranty/After-Sales: Not specified; no AMC details provided.

Key Specifications

  • No explicit technical specs; only indication of 12 tool types for machining valve body per DRG 765-10-17

  • EMD amount clearly stated: ₹19,078

  • Post-receipt inspection by CGM/OFFMK

Terms & Conditions

  • Limited tender enquiry; only established suppliers on the approved list may participate

  • EMD of ₹19,078; GST terms to be applied by bidder; GST reimbursement as actuals or applicable rates

  • Option clause allows ±50% quantity change; delivery period linked to last date of original/extended orders

Important Clauses

Payment Terms

GST payable by bidder; reimbursement as actuals or as per applicable rates; no explicit upfront payment terms provided

Delivery Schedule

Delivery period scales with option clause; additional time equals (increased quantity/original quantity) × original delivery period, minimum 30 days

Penalties/Liquidated Damages

Not specified in provided terms; standard GeM/AVNL provisions may apply upon contract execution

Bidder Eligibility

  • Listed on established supplier list for AVNL GeM tender

  • Compliance with GeM Tech Compliance form submission

  • Submission of required documents (PAN, GSTIN, EFT mandate) for vendor-code creation

AI-Powered Bidder Prediction

Companies most likely to bid

Unlock Bidder Insights

AI predictions on likely bidders

Required Documents

1

PAN Card copy

2

GSTIN certificate copy

3

Cancelled cheque copy

4

EFT Mandate certified by bank

5

GeM Tech Compliance form (mandatory submission)

Frequently Asked Questions

How to participate in AVNL valve tooling tender 2025 in India?

Bidders must be on AVNL's approved supplier list and submit the GeM Tech Compliance form. Provide PAN, GSTIN, cancelled cheque, and EFT Mandate. Ensure EMD of ₹19,078 is wired as specified and comply with post-receipt inspection by CGM/OFFMK.

What documents are required for AVNL limited tender submission 2025?

Required documents include PAN Card, GSTIN, cancelled cheque, EFT Mandate certified by bank, and mandatory GeM Tech Compliance form. These support vendor-code creation and ensure eligibility for the restricted supplier list.

What are the EMD requirements for AVNL valve tooling tender 2025?

The EMD amount is ₹19,078. Bid submissions must include the EMD via the prescribed payment method, with the EMD enabling qualification for evaluation under the limited tender rules.

What are the delivery and quantity terms for AVNL tooling supply?

Quantity may be increased or decreased by up to 50% at contract placement and during the currency at contracted rates. Delivery period adjusts based on (increased quantity/original quantity) × original delivery period, with a minimum of 30 days.

What inspection will AVNL perform for valve tooling procurement 2025?

Post-receipt inspection is conducted by CGM/OFFMK or authorized representative; pre-dispatch inspection is not applicable for this tender, affecting acceptance criteria and invoice processing.

Are packing and marking requirements specified for AVNL tool supply?

Yes. The contractor must ensure proper packing to avoid damage and mark each shipment with the firm name, S.O. number, and month/year of manufacture, ensuring traceability and compliance with transport handling.

What standards or compliance are required for AVNL 12-tool set tender?

The tender requires GeM compliance and adherence to the DRG 765-10-17 specification for valve-body machining tools; GST handling is bidder-responsibility with potential reimbursement as actuals or applicable rate.

When will the GeM Tech Compliance form be required for AVNL tender?

Submission of the GeM Tech Compliance form is mandatory at bid submission; failure to attach it may lead to non-evaluation of the quotation, delaying or disqualifying the bid.