Tender Overview
Advanced Weapons And Equipment India Limited invites bids for a BASE PLATE ASSEMBLY as per DRG No. SK-02134 under the Department of Defence Production. The tender lists a restricted bidder set (Frontier Toolings Kanpur; Rajesh Auto Industries Kanpur; Sri Hans Energy Systems (P) Ltd) and requires an NDA to access the drawing via email within two days of bid publication. No BOQ items are published and no estimated value is disclosed. Bidders should consider GST rules as quoted, with reimbursement as actuals or applicable rates, whichever is lower. The procurement focus hinges on a single component specification linked to the DRG reference, with NDA-first access to technical drawings.
Technical Specifications & Requirements
- Product/Service: BASE PLATE ASSEMBLY as per DRG No. SK-02134
- Organization: Advanced Weapons And Equipment India Limited (Department of Defence Production)
- Bidder Eligibility: Only the following vendors are invited: Frontier Toolings (Kanpur) - Vendor Code F0073; Rajesh Auto Industries (Kanpur) - Vendor Code R0099; Sri Hans Energy Systems (P) Ltd - Vendor Code S0432
- Access to Drawing: Not attached in tender; NDA required; drawing available via [email protected] after NDA submission (within ~2 days of publication)
- GST Consideration: GST paid/reimbursed per actuals or applicable rates (whichever is lower) with tenderer quoted GST percentage
- BOQ: No items published; no quantity/value details provided
- Key Note: No start/end dates, no delivery timeline, no price schedule published
Terms, Conditions & Eligibility
- NDA Required: Must be signed and NDA forwarded to the specified email to obtain drawing
- GST Handling: Bidders must determine GST; reimbursement follows actuals or lower applicable rate
- Certificate/Document Compliance: Offer liable to be rejected if required certificates/documents are not uploaded per Bid Document/ATC
- Vendor Restrictions: Tender issued to three named bidders only; other bids not accepted
- Drawing Access Window: Access within two days of bid publication after NDA submission
- Clarifications/ATC: Any ATC notes supersede general terms; follow the three listed bidders' framework