Tender Overview
Organization: Bharat Heavy Electricals Limited (BHEL) – Department of Heavy Industry, procuring fully finish flange components manufactured and machined as per DRGNO. 29513800053-A and QAP CDE/TH/2025/001R00, and as per DRGNO 31705341979-A with QAP CDE/TH/2025/001R00. Location: BHOPAL, MADHYA PRADESH – 462001. Procurement scope: Only supply of goods for flange fabrication and machining, with two LOTs referenced and delivery timelines: ITEM 1 LOT 1: 8 weeks, LOT 2: 14 weeks; ITEM 2 delivery unspecified in data. No BOQ items listed. Estimated value and EMD not disclosed. Key differentiators include strict fabrication capability within India and pre-defined lot delivery windows.
Technical Specifications & Requirements
- Delivery timeframes: ITEM 1 LOT 1: 8 WEEKS, LOT 2: 14 WEEKS; ITEM 2 delivery timing not clearly specified
- Inspection regime: Pre-dispatch inspection by BY BHEL QC / BHEL TPIA per QAP or post-receipt inspection by BY BHEL QC at BHEL Bhopal
- Eligibility & compliance: Indian fabrication agencies only; machining agencies must show credentials for up to 3 identified machining/drilling vendors; adherence to PQR as enclosed; Integrity Pact to be uploaded
- OPTION CLAUSE: Purchaser may adjust quantity by up to ±25% at contract, with time extensions calculated by (increased quantity/original quantity) × original delivery period, minimum 30 days
- Award splitting: 50:30:20 among three vendors (or 70:30 between two if only two qualify) per GeM rules
- ATC/conditions: ATC requires fabrication capability and vendor qualification per PQR; suspension/debarment status excludes bidders
Terms, Conditions & Eligibility
- Scope of supply: Only supply of goods; no service components
- Delivery schedule: As per LOT-specific targets; extended delivery rules apply under option clause
- Inspection: Pre-dispatch and post-receipt inspection as described; quality acceptance per QAP
- Integrity Pact: Signed copy to be uploaded with bid
- Eligibility: Indian fabrication agency participation; external machining must be credentialed (max 3 agencies)
- Bid evaluation: L1-based split as per GeM procedure; non-compliant bidders barred
- Documents: Must comply with ATC and PQR; interim suspension/debarment disqualifies bidders