Tender Overview
The Directorate Of Purchase And Stores (Department Of Atomic Energy) invites bids for the supply of SS self-priming horizontal mounted centrifugal pumps. The tender scope covers manufacturing, testing, pre-dispatch inspection, packing, supply, safe delivery and warranty. Pre-dispatch inspection may be conducted by the Buyer or an Authorized Agency at the Sellerβs premises, with inspection fees charged to the Buyer. The contract allows payment terms via Demand Draft payable in Mumbai and permits submission of the DD as security in place of a PBG. This tender emphasizes strict certificate uploads and adherence to required ATC clauses, with a focus on timely delivery and compliant documentation. The absence of a BOQ indicates a single-item or unspecified quantity scenario, but the scope clearly centers on SS self-priming centrifugal pumps for internal use or project-specific deployment.
Technical Specifications & Requirements
- Product category: SS self-priming horizontal mounted centrifugal pumps
- Scope: Manufacturing, testing, pre-dispatch inspection, packing, supply, safe delivery and warranty
- Inspection: Pre-dispatch inspection by Buyer/Consignee or nominated External Inspection Agency; 7-day inspection window from email offering date; inspection costs borne by Buyer; rejection rights preserved upon receipt
- Documentation: Upload of all required certificates/documents as per ATC/Corrigendum; EMD/PBG options include DD payable at Mumbai; hard copy DD to be delivered within 15 days post-award
- ATC/Clauses: Reference to DPS NRB/01/N1/1664; includes sample submission and QA/testing protocols as specified
- Delivery/Quality: Safe delivery with warranty coverage; compliance with specification and testing regimes is mandatory
Terms, Conditions & Eligibility
- EMD/PBG: Eligible bidders may submit an Account Payee DD in lieu of PBG; DD payee must be PAY AND ACCOUNTS OFFICER, NRB, Mumbai; hard copy within 15 days after award
- Inspection windows: 7-day readiness period for inspection after email; delays beyond 7 days regularized without LD
- Certificates: Upload of required certificates per ATC; non-submission can lead to rejection
- Scope of supply: Goods-only bid; no BOQ items listed; pre-dispatch testing and packing included
- Payment terms: DD-based security accepted; payment terms aligned to GeM GTC with post-delivery processing
- Delivery & Warranty: Safe delivery and warranty included as part of scope; manufacturer warranties to be honored per contract