Tender Overview
The Indian Army, Department Of Military Affairs, seeks repair or replacement of the Genxt Elite Coupler CP associated with an Integrated HD camera system paired with an HD monitor. The tender governs a potential quantity variation allowance of up to 25% of the bid quantity both at initial award and during the contract, at contracted rates. The term includes delivery time calculations linked to original delivery periods, with a minimum extension framework of 30 days. The BOQ shows zero listed items, indicating the scope or a consolidated single-item requirement may be defined in a separate document. This procurement emphasizes compatibility with Genxt Elite components and HD monitoring capabilities, with ATC terms requiring bidders to adhere to the clause on quantity variation and delivery extensions.
This opportunity is positioned under the Indian Armyβs equipment repair/replacement framework, targeting vendors capable of maintaining or upgrading integrated camera systems and associated display hardware. The ATC clause and quantity flexibilities differentiate this tender by enabling scalable supply under contractual rates, which bidders should model into their project plans and risk registers.
Technical Specifications & Requirements
- Product: Repair/Replacement of Genxt Elite Coupler CP for Integrated HD camera system with HD monitor
- Quantity: Not disclosed; bidder should account for up to 25% variation
- Standards: Not specified in available data; ensure functional compatibility with Genxt Elite components
- Delivery: Calculated per original delivery period with additional time formula: (Increased quantity Γ· Original quantity) Γ Original delivery period, minimum 30 days
- BOQ: Not populated (0 items); expect consolidated or separate specification documents
- Documentation: ATC terms require compliance to option clause and delivery extensions
- Eligibility: Compliance with purchaserβs option/extension mechanism and related terms
Terms, Conditions & Eligibility
- EMD: Not disclosed in the provided data
- Quantity variation: Eligible to increase/decrease up to 25% of bid quantity
- Delivery extension: Additional time calculated as per formula with a minimum of 30 days
- Delivery commencement: From last date of original delivery order; extended period uses extended delivery period
- Compliance: Bidders must comply with the option clause and ATC conditions
- Documentation: Prepare for standard government procurement submissions; exact documents not listed here
- BOQ: Not available; refer to buyer ATC for detailed scope and technical certificates
