NTPC Limited seeks procurement for supply, erection and commissioning of 30 meter long high mast lighting poles including all accessories at the Talaipalli Coal Mining Project, Raigarh, Chhattisgarh 496001. The tender notes an EMD of ₹1,00,000 payable via EFT and requires bid submission through the GeM portal with GST @ 18% included in the total bid price. The BOQ is referenced in the bidding documents, though no items are listed in the provided BOQ summary. This project focuses on durable, outdoor lighting infrastructure for mining operations with a need for timely delivery and installation coordination within site constraints.
Technical Specifications & Requirements
- Project scope: Supply, erection and commissioning of 30m high mast lighting poles with all accessories.
- Location: Talaipalli Coal Mining Project, Raigarh, Chhattisgarh.
- Key procurement detail: Total Bid Price including GST @ 18% to be quoted in the GeM Offer Price tab.
- EMD method: ₹1,00,000 via Electronic Funds Transfer (EFT) prior to bid submission closing date.
- BOQ reference: Section-VII of Bidding Documents; itemized BOQ not listed in summary but required to be reviewed in GEM documents.
- Standard expectations: alignment with mining site safety and outdoor illumination norms; coordination with NTPC on installation sequencing.
- Documentation: Upload of all forms and attachments as per “Forms and Procedures” in Section-VIII of GEM bid documents.
- Compliance: bidder must meet Qualifying Requirements as stated in the NIT/Tender enquiry.
Terms, Conditions & Eligibility
- EMD: ₹1,00,000 to be paid via EFT; non-payment renders bid nonresponsive.
- Total bid pricing: quote inclusive of GST @ 18%; bid should reflect all BOQ items.
- Documentation: upload signed forms and attachments per Section-VIII; include GST, PAN, experience certificates, financials if required.
- BOQ: refer Section-VII; ensure alignment of quoted price with BOQ items; no separate item list provided here.
- ATC: bidder must satisfy NTPC’s qualifying requirements; bank account details for EFT provided in BDS Para 3.0.
- Payment: no explicit payment milestones provided; bidders should anticipate typical site-construction terms and GST compliance.
- Delivery/Installation timelines: not specified in the summary; bidders should prepare delivery plan aligned to Talaipalli project site and NTPC schedules.
- Warranty/Support: not specified in available data; verify in bidding documents and terms.