Tender Overview
Organization: Rourkela Steel Plant, a unit of Steel Authority of India Limited. Product: Hydraulic motor (PN: 1780285-801, Reidville/REIDVILLE). Location: Sundergarh, Odisha 769001. Scope: Supply of goods only; vendor must supply per attached drawings and GA DRG; commissioning support at site. Estimated value and EMD: not disclosed in the available data. A key differentiator is the requirement to align with GA DRG R.S 7.01.214 and attach monogrammed body, name plate, and data sheet with the bid. The tender emphasizes pre-quote GA DRG approval, technical datasheets, and manufacturer authorization for dealers. Submission includes data sheets and datasheet mismatch risks; 80% payment after supply, 20% after commissioning; 12-month performance guarantee (or 18 months from acceptance). Geographic scope targets Indian vendors with LT&E registration. This is a high-precision equipment tender requiring technical alignment with user department approvals and strict documentation.
Technical Specifications & Requirements
- Product/Category: Hydraulic motor with PN 1780285-801 (Reidville)
- Documentation: GA DRG and datasheet must be submitted with offer; GC & TC to accompany material; drawings to be supplied during quotation/technical suitability; drawings approved within two weeks of submission
- Dimensions/fitment: Absorption (L/MIN) and fitment dimensions to match supplied DRG no RS 7.01.214 or equivalent technical details; monogram on body; name plate details on motor body
- Modeling: Make/model in UCS is indicative; one-to-one replacement acceptable with approved technical details
- Quality/Approval: DS, GA DRG, and approval from user department required before manufacturing; inspection per PO terms and approved DS/GA DRG
- Delivery/Commissioning: Bidder to offer commissioning assistance at site; 80% payment after supply, 20% after successful commissioning
- Warranty: Performance guarantee for 12 months from installation or 18 months from acceptance date
- Manufacturing/Verification: Products must meet the attached DRG and datasheet specifications; GST/compliance as per vendor terms
Terms, Conditions & Eligibility
- EMD: Amount not disclosed in the available terms
- Payment Terms: 80% after supply; 20% after successful commissioning
- Delivery/Commissioning: Commissioning assistance at site is required; drawings approved within two weeks of submission
- Documentation: Data sheet, GA DRG, GC/TC to be provided with material; vendor registration via Sail Tend ers portal; valid authorized dealership certificates if applicable
- Eligibility: LTE issued suppliers only; supplier registration with SAIL-RSP required; dealer must attach valid manufacturer authorization for invited manufacturers
- Warranty/Penalties: Performance guarantee for 12 months from installation or 18 months from acceptance; inspection terms align with specified PO terms and approved DS/GA DRG
- Special Clauses: Material to be monogrammed/embossed; name plate details on motor body; make/model as UCS indicative but replaceable with one-to-one parity
