Bid Publish Date
24-Oct-2025, 10:57 am
Bid End Date
05-Dec-2025, 3:00 pm
Location
Progress
Quantity
22
Category
Tracker rollers: M5500000007: RETURN BELT TRACKER ROLLER ASSEMBLY
Bid Type
Two Packet Bid
Ntpc Sail Power Company Ltd invites bids for tracker roller assemblies including RETURN BELT TRACKER ROLLER ASSEMBLY and TROUGHING BELT TRACKER ROLLER ASSEMBLY for delivery at NSPCL stores in DURG, CHHATTISGARH. The contract contemplates delivery within 4 months of PO, with inspection to be conducted at NSPCL STORE. Key financial terms include a 5% PBG for 21 months and a 95% payment after supply (subject to PBG) with the remaining 5% after commissioning. Warranty coverage is 18/12 months from supply/commissioning, and GST implications are at bidder’s discretion per applicable rates. The option clause allows quantity variation up to ±25% during and after contract, with delivery time recalculated accordingly. Bidders must meet vendor code requirements (PAN, GSTIN, cancelled cheque, EFT mandate) and ensure invoicing in the consignee name with GSTIN. This tender emphasizes a robust fitment guarantee and mandatory test certificates for supply. This procurement targets suppliers capable of meeting NSPCL inspection standards and delivering bulk mechanical assemblies under defined warranty and performance conditions.
Tracker roller assemblies: RETURN BELT TRACKER ROLLER ASSEMBLY and TROUGHING BELT TRACKER ROLLER ASSEMBLY
Delivery within 4 months; option clause allows ±25% quantity change with proportional delivery time
Shore hardness 60 ±5; Tensile strength ≥125 kg/cm2; Elongation at break ≥400%; Abrasion loss ≤125 mm3; Operating temperature ≥75°C
PBG 5% of contract value for 21 months; 95% payment after supply, 5% after commissioning
Warranty: 18 months (manufacturing defects) and 12 months (poor workmanship); Fitment Guarantee
Inspection at NSPCL STORE; invoicing in consignee name with GSTIN; GST reimbursement rules per actuals or applicable rate
Delivery within 4 months from PO with ±25% quantity variation allowed
PBG of 5% for 21 months; 95% payment after supply, 5% after commissioning
Mandatory test certificates and warranty/guarantee requirements
95% payment after supply subject to PBG submission; 5% after commissioning subject to PBG; without PBG, balance released after warranty period
Delivery within 4 months from PO; option clause permits quantity variation up to 25% with extended delivery time calculated as (Increased quantity / Original quantity) × Original delivery period with a minimum of 30 days
Not specified in ATC; standard NSPCL terms to be observed; inspection at NSPCL STORE may impact acceptance
Vendor must hold PAN and GSTIN and provide EFT mandate
Must pass NSPCL inspection at store and provide required test certificates
Must submit PBG 5% of contract value for 21 months and qualify for fitment guarantee
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Tracker rollers: M5500000007: RETURN BELT TRACKER ROLLER ASSEMBLY , M5500000008: TROUGHING BELT TRACKER ROLLER ASSEMBLY
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate certified by bank
Endorsed tender document
Nil deviation certificate
SPC (Statistical Process Control) documentation
Test certificates showing Shore hardness, tensile strength, elongation, abrasion loss, operating temperature
Warranty/guarantee certificates for supplied items
Vendor Code Creation documents if applicable
Extended Deadline
05-Dec-2025, 3:00 pm
Opening Date
05-Dec-2025, 3:30 pm
Extended Deadline
28-Nov-2025, 3:00 pm
Opening Date
28-Nov-2025, 3:30 pm
Extended Deadline
21-Nov-2025, 3:00 pm
Opening Date
21-Nov-2025, 3:30 pm
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | A D ELECTRO STEEL CO PVT LTD Under PMA | Make : AD ELECTROSTEEL CO PVT LTD Model : AD ELECTRO STEEL CO PVT LTD Title : Tracker rollers: M5500000007: RETURN BELT TRACKER ROLLER ASSEMBLY | 05-12-2025 11:56:52 | |
| 2 | DRPM INDUS CON-CARE PRIVATE LIMITED Under PMA | Make : INDUSCONCARE Model : TRACK-N (R) Title : Tracker rollers: M5500000007: RETURN BELT TRACKER ROLLER ASSEMBLY | 14-11-2025 12:54:10 | |
| 3 | TEGA INDUSTRIES LIMITED Under PMA | Make : TEGAINDUSTRIES Model : TEGA CENTRAX RETURN TRACKER ROLLER Title : Tracker rollers: M5500000007: RETURN BELT TRACKER ROLLER ASSEMBLY | 13-11-2025 15:04:13 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | DRPM INDUS CON-CARE PRIVATE LIMITED(MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : Tracker rollers: M5500000007: RETURN BELT TRACKER ROLLER ASSEMBLY,M5500000008: TROUGHING BELT TRACK | |
| L2 | TEGA INDUSTRIES LIMITED (MII) Under PMA | Item Categories : Tracker rollers: M5500000007: RETURN BELT TRACKER ROLLER ASSEMBLY,M5500000008: TROUGHING BELT TRACK |
Key insights about CHHATTISGARH tender market
Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate; include techno-commercial bid with Nil deviation and SPC; ensure PBG 5% for 21 months and comply with 4-month delivery, NSPCL inspection, and warranty terms.
Required documents include PAN card copy, GSTIN, cancelled cheque, EFT mandate, endorsed tender document, Nil deviation certificate, SPC, test certificates (hardness, tensile, elongation, abrasion), warranty certificates, and vendor code creation documents.
Although not all specs are listed, the supply requires test certificates: Shore hardness 60 ±5, Tensile strength ≥125 kg/cm2, Elongation ≥400%, Abrasion ≤125 mm3, operating temperature ≥75°C; plus fitment guarantee and NSPCL inspection.
Delivery is expected within 4 months from receipt of PO; quantity may be adjusted by up to ±25% with recalculated delivery time per the option clause.
Payment releases: 95% after supply subject to PBG submission; 5% after commissioning subject to PBG; if no PBG, the balance is released after the warranty period.
Warranty covers manufacturing defects for 18 months and workmanship for 12 months from date of supply/commissioning; fitment guarantee is applicable to ensure proper installation.
Bidder must submit a 5% of contract value performance bank guarantee for a period of 21 months; PBG aligns with contract value and performs through the warranty period.
Inspection is conducted at NSPCL STORE before acceptance; non-conforming items may be rejected; ensure all test certificates accompany shipment for smooth clearance.
Sign up now to access all documents
Main Document
BOQ
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS