Tender Overview
Neyveli Uttar Pradesh Power Limited seeks services for Commissioning of Automatic Generation Control (AGC) at the Ghatampur site, with ABB India Limited as the approved STE bidder. The scope includes deputation of a commissioning engineer on a man-days basis for Unit-1, Unit-2, and Unit-3 supervision, plus supply, installation, and configuration of a firewall replacement with a 3-year license to be provided by ABB. The contract duration is 1 year from PO issue, with a separate obligation to implement AGC-related graphic and logic modifications per NUPPL requirements. The project itemizes unit-wise payments upon successful commissioning, and the unit rate for supervision at 3x660 Ghatampur remains valid for one year post award. A mandatory 18% GST applies on the basic price, and the firewall carries a 12-month warranty. The BOQ contains no items, signaling a service-oriented engagement with limited hardware scope beyond firewall replacement and commissioning activities.
Technical Specifications & Requirements
- Scope: Deployment of AGC commissioning engineer (Unit-1 to Unit-3), firewall replacement for network security, and configuration with a 3-year ABB-provided license.
- Warranty: Firewall warranty of 12 months from commissioning date.
- Delivery/Performance: Unit-wise commissioning complete with Installation & Commissioning Protocol (ICP) signed by contractor and NUPPL; man-days counted after reporting at GTPS site.
- Payment Terms: Payment on completion of each unit; unit-wise price governs invoicing; payment within 15 days of invoice submission.
- Contract Period: 1 year from issue of Purchase Order; rate validity for supervision at 3x660 Ghatampur for 1 year.
- Exclusions: No hardware/civil works related to AGC panel and cables included in bidder scope.
- Tax: 18% GST on basic price.
- Documentation: Passport photo, Aadhar, group insurance/Mediclaim, and company ID for gate passes; certificates must be uploaded as per ATC/ corrigendum.
Terms, Conditions & Eligibility
- EMD/Security: Not specified in data; bidders must upload required certificates as per ATC.
- Experience: Deputation of commissioning engineer with AGC experience; adherence to NUPPL requirements for graphic/logic modifications.
- Delivery/Timeline: 1-year contract; man-days counted after GTPS site reporting; ICP submission precedes payments.
- Payment: Unit-wise payments post-work completion; 15-day settlement after invoice; price schedule governs calculation.
- Documents: GST, PAN, experience certificates, financial statements, OEM authorizations, technical bid documents, and passport-size photos with IDs for gate entry.
- ATC Clause: Only ABB India Limited bids will be evaluated; other submissions treated as unsolicited.
- Penalty/Warranty: No LD; firewall warranty 12 months; no contract performance guarantee.