Tender Overview
Hindustan Aeronautics Limited (HAL), operating under the Department Of Defence Production, invites bids for security equipment procurement to be delivered to the HAL Overhaul Division, Bangalore, Karnataka. The tender encompasses six items, with no explicit itemwise specifications disclosed in the BOQ. The contract features a 50% quantity option at contract award and potential extension aligned with original delivery timelines. A standard HAL warranty applies, with 24 months from supply/acceptance, and a minimum uptime target of 95% during the warranty. 100% payment is stated within 45 days of installation, acceptance, and commissioning. Bidders must prepare a data sheet match and complete vendor code creation documentation (PAN, GSTIN, cancelled cheque, EFT mandate). GST will be reimbursed at actuals or prevailing rates, subject to the quoted GST rate. Delivery terms are specified for HAL Overhaul Division, Bangalore. Unique terms include data-sheet verification and post-award quantity adjustments at contracted rates.
Technical Specifications & Requirements
- Delivery location: HAL Overhaul Division, Bangalore
- Warranty: 24 months from supply/acceptance; defects remedied at supplier cost; replacement/renewal free during warranty; minimum uptime of 95%; to-and-fro freight/insurance covered by supplier
- Payment terms: 100% payment within 45 days of receipt, acceptance, and commissioning
- Option clause: Purchaser may increase/decrease quantity up to 50% at contract rates; extended delivery time calculated as (Additional quantity ÷ Original quantity) × Original delivery period, minimum 30 days
- Documentation: Data Sheet of offered products; PAN, GSTIN, cancelled cheque, EFT mandate; vendor code creation
- GST: Reimbursement as per actuals or applicable rates, whichever is lower, up to quoted GST percent
- BOQ: 6 items; no explicit quantities listed in the provided data
Terms, Conditions & Eligibility
- EMD not disclosed in the available data; bidders should assume standard EMD as per HAL policy
- Delivery timeframe: as per option clause, with extended delivery periods
- Warranty scope: standard HAL warranty; defect remedy and replacement at no extra cost
- Payment cadence: 100% within 45 days post-installation/commissioning
- Data verification: Data Sheet must match product specifications; mismatches may lead to bid rejection
- GST compliance: GST return/reimbursement aligned with actuals or lower of quoted rate
- Vendor registration: PAN, GSTIN, cancelled cheque, EFT mandate required for vendor code creation
- Delivery terms: Specific to HAL Overhaul Division, Bangalore; acceptance implied via commissioning