Design, Engineering, Manufacture, Supply, Testing and supervision of ETC of 11/132KV 3 Ph28.5 MVA G
EMD
₹16,60,000
Deadline
23 Oct 2025
Location
NORTH CACHAR HILLS, ASSAM
Tender Progress
Design, Engineering, Manufacture, Supply, Testing and supervision of ETC of 11/132KV 3 Ph28.5 MVA G
Tender Key Details
Organization
North Eastern Electric Power Corporation Limited
Department
Hydro Power
Quantity
1
Bid Validity
180 (Days)
Bid Type
Two Packet Bid
Tender Overview
Design, Engineering, Manufacture, Supply, Testing and supervision of ETC of 11/132KV 3 Ph28.5 MVA G
Important Timeline
Start: 25 Sept 2025
End: 23 Oct 2025
AI-Powered Bidder Prediction
Discover which companies are most likely to bid
Unlock Bidder Insights
Get AI-powered predictions about which companies are most likely to bid on this tender
Additional Information
Design, Engineering, Manufacture, Supply, Testing and supervision of ETC of 11/132KV 3 Ph28.5 MVA G
Item Category
Design, Engineering, Manufacture, Supply, Testing and supervision of ETC of 11/132KV 3 Ph28.5 MVA GT
Organization Details
Authority
Organization
North Eastern Electric Power Corporation Limited
Department
Hydro Power
Ministry
Ministry of Power
Contact
State
ASSAM
Documents & Downloads
GeM-Bidding-8400686.pdf
Main Document
Other Documents
OTHER
Buyer uploaded ATC document
ATC
Buyer uploaded ATC document
ATC
GEM General Terms and Conditions Document
GEM_GENERAL_TERMS_AND_CONDITIONS
Required Documents from Seller
Experience Criteria,Past Performance,Bidder Turnover,Certificate (Requested in ATC),OEM Authorization Certificate,OEM Annual Turnover,Additional Doc 1 (Requested in ATC),Additional Doc 2 (Requested in ATC),Additional Doc 3 (Requested in ATC),Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Corrigendum & Updates
Update #1
10 Oct 2025
Additional Info
Evaluation Method
Total value wise evaluation
Inspection Required
No
Arbitration
No
Bid to RA
Yes