GEM Active

Design, Engineering, Manufacture, Supply, Testing and supervision of ETC of 11/132KV 3 Ph28.5 MVA G

EMD

₹16,60,000

Deadline

23 Oct 2025

Location

NORTH CACHAR HILLS, ASSAM

Tender Progress

Issue
Corrigendum
Technical
Financial
Award

Design, Engineering, Manufacture, Supply, Testing and supervision of ETC of 11/132KV 3 Ph28.5 MVA G

Tender Key Details

Organization

North Eastern Electric Power Corporation Limited

Department

Hydro Power

Quantity

1

Bid Validity

180 (Days)

Bid Type

Two Packet Bid

Tender Overview

Design, Engineering, Manufacture, Supply, Testing and supervision of ETC of 11/132KV 3 Ph28.5 MVA G

Important Timeline

Start: 25 Sept 2025

End: 23 Oct 2025

AI-Powered Bidder Prediction

Discover which companies are most likely to bid

Live Analysis

Unlock Bidder Insights

Get AI-powered predictions about which companies are most likely to bid on this tender

Additional Information

Design, Engineering, Manufacture, Supply, Testing and supervision of ETC of 11/132KV 3 Ph28.5 MVA G

Item Category

Design, Engineering, Manufacture, Supply, Testing and supervision of ETC of 11/132KV 3 Ph28.5 MVA GT

Organization Details

Authority

Organization

North Eastern Electric Power Corporation Limited

Department

Hydro Power

Ministry

Ministry of Power

Contact

State

ASSAM

Documents & Downloads

GeM-Bidding-8400686.pdf

Main Document

Other Documents

OTHER

Buyer uploaded ATC document

ATC

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Required Documents from Seller

Experience Criteria,Past Performance,Bidder Turnover,Certificate (Requested in ATC),OEM Authorization Certificate,OEM Annual Turnover,Additional Doc 1 (Requested in ATC),Additional Doc 2 (Requested in ATC),Additional Doc 3 (Requested in ATC),Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum & Updates

Update #1

10 Oct 2025

Additional Info

Evaluation Method

Total value wise evaluation

Inspection Required

No

Arbitration

No

Bid to RA

Yes