Tender Overview
The tender seeks fabrication of GI stools for erection of a Current Transformer at Parli substation, under POWERGRID's bid framework. Exact quantity and total estimated value are not disclosed in the available data, but the scope focuses on GI stool fabrication as a critical infrastructure component. Bidders should anticipate standard bid documents and ATC requirements, including information sharing on TS data sheets and declared parameters. A notable feature is the quantity/duration flexibility up to 25% at the contract issue stage, with a binding option to adjust within this band post-award. The absence of a BOQ item list suggests a scope-driven, fabrication-centric contract requiring precise technical alignment with specifications. The procurement emphasizes compliance with buyer-specified formats and mandatory declarations. Unique aspects include adherence to the DoE/PowerGrid-style documentation ecosystem and the integration of multiple forms (Form No. 1–7) for transparency and integrity.
Technical Specifications & Requirements
- Product/Service: Fabrication of GI stools for erection of a Current Transformer at Parli substation.
- Scope: Fabrication only; installation/erection not explicitly detailed in the available data.
- Documentation: Upload TS data sheet, bid documents, and any applicable ATC/Scope of Work; mandatory declarations on additional specifications.
- Compliance: Alignment with buyer-provided TS parameters and adherence to PowerGrid procurement formats and DoE order-based declarations.
- ATC: Includes standard PowerGrid/DoE documentation suite (Form No. 1–7) and whistleblower/fraud prevention declarations.
- Value/Quantity: Not disclosed; expect a fabrication-only engagement with variable quantity handling up to ±25% at contract issue.
Terms, Conditions & Eligibility
- EMD/Performance security: Not disclosed in the data; bidders should prepare per typical POWERGRID norms and ATC references.
- Delivery: Not specified in the provided data; likely tied to project erection timeline at Parli substation.
- Documentation: Mandatory TS data sheet, signed technical scope, and all DoE/PowerGrid Form No. 1–7 declarations.
- Sub-contracting: Consent required from buyer for any assignment or subcontracting. Joint and several liability applies.
- Compliance: Bidder must upload the required certificates and adhere to ATC-clause stipulations; non-submission risks bid rejection.