Tender Overview
The Indian Army, Department of Military Affairs, invites bids for supply-only of nine mechanical assemblies and components, including Pipe Fuel Pump to Filter, Pad, Fuel Motor, Speedometer Cable, Cover Assembly, Disc Clutch, Mounting Engine Front, Absorber Assembly Rear Shock, and Absorber Assembly Front Shock. The BOQ lists 9 items with unspecified quantities and values, indicating a broad supply scope in the vehicle and engine subsystem category. The bid allows a 25% quantity variation and 25% extension at contracted rates, with delivery timing linked to the original delivery period. An advance sample approval process is required before bulk manufacturing, with a 5-day window for submission and a 5-day response for modification. The project emphasizes conformity to contract specifications and potential sample-based deviations. Unique aspects include the flexible option clause and sample-based acceptance framework. This tender is aimed at firms capable of supplying multiple automotive components to defence procurement programs in India.
Technical Specifications & Requirements
- Product/service names: Pipe Fuel Pump to Filter, Pad, Fuel Motor, Speedometer Cable, Cover Assembly, Disc Clutch, Mounting Engine Front, Absorber Assembly Rear Shock, Absorber Assembly Front Shock.
- Supply type: Goods-only (not turnkey services).
- Quantity/BOQ: 9 items; exact quantities not disclosed.
- Special procurement terms: 25% quantity variation; extension of delivery period with formula (Increased quantity รท Original quantity) ร Original delivery period, minimum 30 days.
- Sample requirements: 2 advance samples to be submitted within 5 days of award; modifications provided within 5 days; bulk supply aligned to approved sample.
- Delivery & acceptance: Delivery timeline tied to last date of original delivery order; LD implications tied to sample approval delays.
- Compliance context: No detailed technical standards provided in the data; emphasis on contract-spec conformity and sample approval.
Terms, Conditions & Eligibility
- EMD: Not specified in available data.
- Scope: Supply of Goods only; no services.
- Sample/approval: Advance sample(s) required; failure to approve or deviations may lead to termination or further modification.
- Delivery timing: Based on original delivery period; extended timeline computed per option clause with minimum 30 days.
- Payment terms: Not detailed in the provided terms.
- Documentation: Standard bid submission documents implied (GST, PAN, experience certificates) but exact list not specified here.
- Compliance risk: Non-conformity of samples may trigger re-sampling or termination at buyerโs discretion.