Tender Overview
Rashtriya Ispat Nigam Limited invites bids for belt conveyor components featuring M24, 1200mm width with IS 1891 P-1 design standard and Nylon Nylon Grade material, cover M. The procurement aligns with VSP facility requirements in Visakhapatnam, Andhra Pradesh. Project scope references a belt/conveyor series with 6x2mm specification and the option for quantity variation up to 25% during contract execution. Unique terms include a fatal delivery clause and GCC-aligned contract framework. Estimated value and EMD are not disclosed in the data available. The tender emphasizes strict adherence to detailed terms, authenticity undertakings, and anti-collusion declarations to ensure compliance with procurement norms.
Technical Specifications & Requirements
- Product category: Belt conveyor components in nylon material per design spec IS: 1891, P-1
- Dimensions from title: 1200mm belt width; 6x2mm component sizing; 1400/4 variant also mentioned
- Core standard: IS 1891 (P-1) for belt construction
- Material: Nylon Nylon Grade with cover designated as M
- OEM/brand requirements: Not explicitly stated; attention to ATC terms and GCC governance
- Delivery: Fatal delivery clause documented; delivery window linked to original and extended periods with option-adjusted timelines
- Other: No BOQ items; no explicit quantity or unit rate data available
- Quality/Compliance: Annexure-based undertakings and non-collusive tendering certificate are required
Terms, Conditions & Eligibility
- EMD: Not disclosed in the provided data; ensure readiness per GCC terms and ATC
- Delivery terms: Delivery schedule tightly governed by fatal delivery clause; extension mechanics defined by option clause
- Documentation: Undertakings on authenticity, non-collusive bid certificate, OEM authorizations if applicable
- Eligibility: Compliance with Detailed Terms and Conditions (ver 1.18) and GCC; absence of scope changes
- Penalties: Liquidated damages and performance-related clauses implied via GCC framework
- Payment: Terms not specified in data; bidders should review GCC for payment terms and milestones