Tender Overview
Cement Corporation Of India Limited (CCI) seeks the spur gear of wagon tippler as per drawing E, CCI-TDR/WT/4.14/014. The scope is Supply of Goods only, with an EMD of βΉ11,000 and an opportunity clause enabling up to 25% quantity variation at contract. Buyers must submit Annexure 1-10, balance sheets for 2021-22 to 2023-24, and relevant PO copies as proof of experience. The procurement emphasizes prior gear/wagon component experience and technical detailing via the ATC. The tender includes a right to extend delivery time per the option clause, demanding precise adherence to contracted rates. This tender appears under the Heavy Industry framework and targets vendors capable of delivering specialized wagon spur gears.
Technical Specifications & Requirements
- Product: Spur gear for wagon tippler, as per drawing E, CCI-TDR/WT/4.14/014; no standalone technical specs provided in the summary.
- Estimated value/quantity: Not disclosed; scope states Only supply of Goods.
- Documentation to accompany bid: Annexures 1β10 signed and stamped; Balance sheet for 2021-22, 2022-23, 2023-24; Relevant Purchase Orders from last 3 years; Technical details of offered item; Vendor code creation documents per ATC.
- ATC requirements: Provide technical details of item; demonstrate prior experience with similar components; ensure bid package includes all mandatory documents.
- Delivery scope: Delivery period governed by option clause; extension rules specified; delivery may adjust by up to 25% quantity during contract currency.
- EMD: βΉ11,000.
Terms, Conditions & Eligibility
- EMD: βΉ11,000 as per tender; eligible bidders must furnish EMD documents.
- Option clause: Purchaser may increase/decrease quantity by up to 25% at contract and during currency; delivery time adjusts via formula: (Increased quantity Γ· Original quantity) Γ Original delivery period, minimum 30 days.
- Bidder documents: PAN, GSTIN, cancelled cheque, EFT mandate; Annexures 1β10; Balance sheets; relevant POs; technical details.
- Scope of supply: Only supply of goods; no services bundled; adherence to drawing specification is mandatory.
- Experience/verification: Demonstrate prior supply of similar wagon gear components; provide PO copies for last 3 years; technical capability to meet shaft/gear tolerances implied by the wagon tippler context.
- Delivery terms: Not explicitly defined; governed by option clause and original delivery period; bidders must align with extended delivery timing rules.
- Payment terms: Not explicitly specified in the summary; to be clarified in official tender documents; ensure compliance with GST, PAN, and EFT requirements.
