Tender Overview
Bokaro Steel Plant, a unit of the Steel Authority of India Limited, invites bids for the supply of a Locomotive Air Compressor (Part No-11380032). The procurement scope is limited to the supply of goods, with no BOQ items published. The bid includes an option clause allowing up to 25% quantity fluctuation, with delivery timelines tied to the original and extended periods. Bidders should ensure data sheet alignment and OEM authorization to avoid rejection. Post-delivery inspection will be conducted by Bokaro Steel Plant officials, and packing must prevent transit damage. The engagement requires adherence to ATC terms and a robust packing standard to mitigate pilferage and damage, reflecting the critical nature of locomotive air compressor components.
Technical Specifications & Requirements
- Product name: Locomotive Air Compressor, Part No-11380032
- Scope of supply: Only supply of goods; inclusive of all cost components
- Delivery/inspection: Post receipt inspection at consignee site; pre-dispatch inspection waived; packing quality to prevent damage and pilferage
- Data sheet: Mandatory upload; must match offered parameters
- Manufacturers/OEM: Manufacturer Authorization required for authorized distributors; include OEM details (name, designation, address, email, phone)
- Warranty/defects: 12 months from date of use/operation; renewal or replacement obligation for design/material/workmanship defects; potential 18 months term referenced
- ATC compliance: Follow Special Conditions of Bid Invitation (SCBI) and ensure data sheet verification against technical parameters
Terms, Conditions & Eligibility
- Option clause: Up to 25% increase/decrease in quantity at contracted rates; extended delivery time calculation as (increased quantity Γ· original quantity) Γ original delivery period, min 30 days
- GST: Bidder to determine applicable GST; reimbursement as per actuals or lower applicable rate
- Data sheet VERIFICATION: Mandatory data sheet upload; mismatch may lead to rejection
- Vendor authorization: OEM authorization required for non-manufacturer bidders
- Inspection: Post-receipt inspection by Bokaro Steel Plant officials; pre-dispatch waived
- Packing: Good packing to prevent damage/pilferage during transit
- Warranty: Minimum 12 months; possible 18 months indicated in text; subject to condition of use
- ATC compliance: Strict adherence to bid terms and supplier responsibilities
