TenderDekho Logo
Closed GEM

Indian Army Department of Military Affairs Automotive Spare Parts Tender 2025 for 29 Items including Air Cylinder, Wiper Arm and Ball Joint – DEFENCE procurement

Bid Publish Date

19-Oct-2025, 10:32 am

Bid End Date

29-Oct-2025, 11:00 am

Progress

RA
Issue19-Oct-2025, 10:32 am
Reverse AuctionCompleted
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

428

Category

AS Flywheel

Bid Type

Two Packet Bid

Categories 33

Tender Overview

The Indian Army, Department Of Military Affairs, invites bids for an automotive spare parts procurement comprising multiple items such as air cylinder, wiper arm, ball joint, rear mirror, and other listed components across 29 total items. No explicit quantities or estimated value are disclosed in the BOQ. The tender requires vendor registration with a Defence organisation, manufacturer authorisation where applicable, and a NDA. An option clause allows up to 50% quantity variation at contract award and potential extension of delivery time with minimum 30 days, subject to original delivery timelines. Bidders should anticipate a defence-specific procurement process and ensure compliance with the organisation’s vendor code creation prerequisites.

Technical Specifications & Requirements

  • Title implies procurement of multiple mechanical and automotive spare parts for military applications, including items such as Pump, Air Gauge, Lamp RH, and Armature components listed in the category.
  • No explicit technical specifications or performance thresholds are published in the tender data; bidders should rely on OEM part compatibility and standard Defence procurement practices.
  • Key compliance points include Manufacturer Authorization where applicable, and NDA to protect contract information. Terms allow quantity variation up to 50% and extended delivery windows calculated by a formula linked to original delivery time. Ensure readiness to meet Defence empanelment requirements for award eligibility.
  • Additional notes emphasize GST guidance, PAN, GSTIN submission, and EFT mandate for bid submission, along with the need to upload an undertaking regarding financial standing.

Terms & Eligibility

  • EMD amount not disclosed in the data; bidders must satisfy standard defence EMD/security expectations where applicable.
  • Registration with Defence Ordnance/DEPOT authorities is mandatory at bid opening; non-registered bidders should complete registration beforehand.
  • Documentation required at bid submission includes PAN, GSTIN, cancelled cheque, EFT mandate, and Manufacturer Authorization if bidding through an authorised distributor. A non-disclosure declaration on bidder letterhead is required. The vendor code creation process is triggered by the bid.

Key Specifications

  • Product/service names and categories: automotive spare parts list including air cylinder, wiper arm, ball joint, rear mirror, lamp, pump, hose, and armature assemblies.

  • Quantities: not specified in BOQ; 29 total items listed; no unit values.

  • Estimated value/EMD: not disclosed in tender data.

  • Delivery location/installation: not specified; defence procurement context implies primary military use.

  • Standards/ certifications: none published; advise OEM conformity and defence procurement compliance.

Terms & Conditions

  • Option clause enabling up to 50% quantity variation at award and during currency

  • Mandatory defence vendor registration prior to bid opening

  • NDA and OEM authorization requirements for bidders

Important Clauses

Payment Terms

GST alignment and actual GST reimbursement; no fixed EMD amount disclosed

Delivery Schedule

Delivery period may be extended; increased quantity time should be computed as (increased quantity ÷ original quantity) × original delivery period with a minimum of 30 days

Penalties/Liquidated Damages

Not specified in data; expected to align with Defence procurement norms

Bidder Eligibility

  • Not under liquidation or similar proceedings

  • Registered with Defence/ORD DEPOT or able to obtain registration before bid opening

  • Manufacturer Authorization if bidding through authorized distributors

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

G Pump , AIR Cylinder , B Pulley , Rear Mirror , Wiper , Arm Wiper LH , Armature , A Assy , Armature 19024318 , Ball Joint , B Joint LH , Joint Threads , Cross Member , AS Flywheel , Gear Shift , Hose , Hose 11 , Assy Pipe , Air Gauge , Pipe Air Gauge I , Lamp RH , Chock , Wiper Arm , Circuit AZR , Back Assy LH , Back Assy RH , Ball , Ball Case , Ball Joint LH

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8493766.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 29 Items Sign in for GEM prices

#1

G Pump

LV7/MARUTI/ 17431M60A20/ GASKET WATER PUMP

11 nos Delivery: 45 days
#2

AIR Cylinder

LV7/STLN/ 2530-018101/ AIR CYLINDER

8 nos Delivery: 45 days
#3

B Pulley

LV7/T-815/ 130-011-110-744/ ALTERNATOR BELT PULLEY

14 nos Delivery: 45 days
#4

Rear Mirror

LV7/STLN(VF)/ 2540-72-0151487/ ARM REAR VIEW MIRROR

3 nos Delivery: 45 days
#5

Wiper

LV7/TATA/ 2540-008747/ ARM WINDSHIELD WIPER

81 nos Delivery: 45 days
#6

Arm Wiper LH

LV7/MARUTI/ 2540-006506/ ARM ASSY WIPER LH

10 nos Delivery: 45 days
#7

Armature

LV7/MARUTI/ 31311-82632/ ARMATUR

2 nos Delivery: 45 days
#8

A Assy

LV7/MARUTI/ 31311M80110/ ARMATURE ASSY

21 nos Delivery: 45 days
#9

Armature 19024318

LV7/T-815/ 990-115-007-000/ ARMATURE-19024318

5 nos Delivery: 45 days
#10

Ball Joint

LV7/TATA/ 250726700152/ ASSY BALL JOINT

19 nos Delivery: 45 days
#11

B Joint LH

LV7/TATA/ 3040-022282/ ASSY BALL JOINT LH

6 nos Delivery: 45 days
#12

Joint Threads

LV7/TATA/ 264126800225/ ASSY BALL JOINT LH THREADS

65 nos Delivery: 45 days
#13

Cross Member

LV7/TATA/ 215431200111/ ASSY CROSS MEMBER FOR AGB MTG

15 nos Delivery: 45 days
#14

AS Flywheel

LV7/TATA/ T06560000053/ ASSY FLYWHEEL

5 nos Delivery: 45 days
#15

Gear Shift

LV7/TATA/ 219826700101/ ASSY GEAR SHIFT LEVER KNOB

22 nos Delivery: 45 days
#16

Hose

LV6-MT6/ 2085-4680-0108/ ASSY HOSE

13 nos Delivery: 45 days
#17

Hose 11

LV7/TATA/ 2510-4350-0125/ ASSY HOSE

11 nos Delivery: 45 days
#18

Assy Pipe

LV7/TATA/ 2154-4290-0159/ ASSY PIPE

3 nos Delivery: 45 days
#19

Air Gauge

LV7/TATA/ 2154-4290-0132/ ASSY PIPE (TO AIR GAUGE 2)

6 nos Delivery: 45 days
#20

Pipe Air Gauge I

LV7/TATA/ 2154-4290-0131/ ASSY PIPE (TO AIR GAUGE I)

3 nos Delivery: 45 days
#21

Lamp RH

LV7/TATA/ 2574-5441-0134/ ASSY TAIL LAMP RH

10 nos Delivery: 45 days
#22

Chock

LV7/TATA/ 2547-092-0127/ ASSY WHEEL CHOCK

3 nos Delivery: 45 days
#23

Wiper Arm

LV7/TATA/ 264182400109/ ASSY WIPER ARM

25 nos Delivery: 45 days
#24

Circuit AZR

LV1/R72/ BM349.0630.613/ AUTOMATIC CIRCUIT BREAKER AZR-10A

14 nos Delivery: 45 days
#25

Back Assy LH

LV7/MARUTI/ 85302M83031/ BACK ASSY LH

1 nos Delivery: 45 days
#26

Back Assy RH

LV7/MARUTI/ 85301M83050/ BACK ASSY RH

14 nos Delivery: 45 days
#27

Ball

LV7/MARUTI/ 06111M10004/ BALL

3 nos Delivery: 45 days
#28

Ball Case

LV7/MARUTI/ 06111M12004/ BALL CASE

15 nos Delivery: 45 days
#29

Ball Joint LH

LV7/STLN(VF)/ F-7456100 (ALT F7882500)/ BALL JOINT/BALL JOINT LH

20 nos Delivery: 45 days

Required Documents

1

GST registration certificate

2

PAN card

3

Cancelled cheque copy

4

EFT mandate letter certified by bank

5

Manufacturer Authorization / OEM authorization (if bidding via distributor)

6

Non-disclosure declaration on bidder letterhead

7

Vendor code creation documents (as applicable)

Reverse Auction Schedule

Completed

Start

02-Nov-2025, 1:00 pm

End

03-Nov-2025, 1:00 pm

Duration: 24 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1
M/S GOOD-DAY TRADERS   Under PMA
-28-10-2025 19:35:30
2
M/S JK TRADERS   Under PMA
-28-10-2025 18:24:26
3
M/S Raman Trading Corp.   Under PMA
-28-10-2025 19:05:54
4
SANATAN CAPITALS   Under PMA
-28-10-2025 20:40:52

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1M/S GOOD-DAY TRADERS(MII)   Under PMA Winner ₹4,65,191Item Categories : G Pump,AIR Cylinder,B Pulley,Rear Mirror,Wiper,Arm Wiper LH,Armature,A Assy,Armature 19024318,Ball
L2SANATAN CAPITALS (MII)   Under PMA₹5,04,655Item Categories : G Pump,AIR Cylinder,B Pulley,Rear Mirror,Wiper,Arm Wiper LH,Armature,A Assy,Armature 19024318,Ball
L3M/S JK TRADERS (MII)   Under PMA₹5,85,413Item Categories : G Pump,AIR Cylinder,B Pulley,Rear Mirror,Wiper,Arm Wiper LH,Armature,A Assy,Armature 19024318,Ball

🎉 L1 Winner

M/S GOOD-DAY TRADERS(MII)   Under PMA

Final Price: ₹4,65,191

Frequently Asked Questions

Key insights about JAMMU AND KASHMIR tender market

How to bid in the Indian Army automotive spare parts tender 2025?

Bidders must complete vendor registration with Defence/ORD DEPOT before bid opening, submit PAN, GSTIN, cancelled cheque, EFT mandate, and Manufacturer Authorization if applicable. Include a NDA on letterhead and ensure GST guidance compliance. Ensure all 29 item categories align with OEM specifications and prepare for a possible 50% quantity variation.

What documents are required for the Army spare parts bid 2025?

Submit GST certificate, PAN card, cancelled cheque, EFT mandate, and OEM authorization if bidding through a distributor. A non-disclosure declaration is required on the bidder’s letterhead. Complete vendor code creation documentation to participate, and ensure defence empanelment is in place before bid opening.

What are the delivery terms for the Indian Army parts tender 2025?

Delivery periods can be extended; additional time is calculated as (increased quantity ÷ original quantity) × original delivery period with a minimum of 30 days. The option clause allows up to 50% quantity variation at contract award and during the contract currency.

What standards or certifications are specified for the army parts tender 2025?

No explicit IS/ISO standards are listed in the tender data. Bidders should rely on OEM conformity and defence procurement norms, ensuring parts are compatible with Indian Army equipment and meet OEM warranty terms.

How is GST handled for the Army defence tender 2025?

GST will be reimbursed as actuals or at applicable rates, whichever is lower, up to the quoted GST percentage. Bidders must quote GST and follow the GST guidance provided; the buyer bears no responsibility for miscalculation.

What is required for Manufacturer Authorization in this defence bid 2025?

Submit an Authorization Form/certificate detailing OEM name, designation, address, email, and phone number. This is mandatory when Authorized Distributors submit bids, ensuring direct OEM accountability for supplied parts.

What constitutes the NDA requirement for the army parts procurement?

A non-disclosure declaration must be on the bidder’s letterhead, stating no contract details or designs will be disclosed during or after contract; breach may trigger legal action per applicable rules.