The procuring organization is the Indian Army under the Department Of Military Affairs, seeking a Barrel Cleaning Machine 81 MM Mor Modified. The scope includes Supply, Installation, Testing and Commissioning with potential quantity adjustments up to 25% during contract and currency. The bid requires detailed design drawings within 7 days of award, with buyer approval or modification lists issued within 7 days. The tender emphasizes ongoing supply according to approved drawings, with no specified location provided. A key differentiator is the option clause governing delivery timelines and extended periods. The procurement focuses on replacing or upgrading gunnery support equipment with precise, manufacturer-backed capabilities. Unique terms include a requirement for post-award approved designs and adherence to buyer-determined delivery windows.
- Organization: Indian Army
- Product: Barrel Cleaning Machine 81 MM Mor Modified
- Location: Not specified
- Estimated value/EMD: Not disclosed
- Delivery scope: Supply, Installation, Testing and Commissioning
- Optional quantity adjustment: up to 25% at contract time and during currency
- Key constraint: timely design approval and modification workflow
Technical Specifications & Requirements
- The tender requires Detailed Design Drawings to be approved by the buyer within 7 days of award; modifications, if any, to be provided within another 7 days.
- If drawings approval is delayed by the buyer, the delivery period shall be refixed with no LD for the delay period.
- Bidder must not be in liquidation or similar financial distress; must upload an undertaking to that effect.
- Equipment must be market-viable with at least 4 years residual market life; obsolescence in the OEM catalog is not acceptable.
- Scope of supply includes delivery terms: Supply, Installation, Testing and Commissioning.
- GST is bidderโs responsibility; reimbursement limited to actuals or applicable rate, whichever is lower, capped to quoted GST.
- Minimum turnover requirement: three-year average audited turnover or CA certificate support (exact figure not specified).
Terms & Eligibility
- Option Clause: quantity may increase up to 25% at contract and during currency; delivery timeline adjusted proportionally with a minimum of 30 days.
- Detailed design drawings must be approved before fabrication; no LD for buyer delay in drawing approval.
- Financial standing: no liquidation or court receivership; bidder must submit an undertaking.
- Product lifecycle: non-end-of-life product with at least 4 years residual market life.