Tender Overview
The Indian Institute Of Technology (IIT), Department Of Higher Education, invites bids for a Cavity mirrors with accessories and Etalon package located in Dharwad, Karnataka 580001. The bid security is ₹180,000 EMD. Scope includes Supply, Installation, Testing and Commissioning of goods. Bidders must submit a Data Sheet and ensure it matches product specifications; OEM-certified installation is mandatory, with Manufacturer Authorization where applicable. A mandatory logo print per buyer instructions is required. A 1-year warranty from final acceptance applies, with OEM warranty certificates due at delivery. Unique terms emphasize vendor accountability and termination rights for non-compliance.
Technical Specifications & Requirements
- Scope of supply: Supply, Installation, Testing and Commissioning of cavity mirrors with accessories and Etalon.
- Data Sheet: Upload and ensure alignment with offered product parameters; justification required for any mismatch.
- Installation/Configuration: Performed by OEM or OEM-certified resource or OEM-authorised reseller.
- Manufacturer Authorization: Include OEM/Original Service Provider details with contact information.
- Branding: Seller must print the logo as per buyer requirements.
- Warranty: 1 year warranty from date of final acceptance or post-installation completion; OEM certificates to be submitted at delivery.
- Documentation: Relevant OEM warranties, data sheets, and installation certificates to be provided with bid.
Terms, Conditions & Eligibility
- EMD: ₹180,000.
- Data Sheet alignment: Data Sheet must match technical parameters; mismatches may lead to bid rejection.
- Scope clause: Bid price includes supply, installation, testing and commissioning.
- Sub-contracting: Not allowed without prior written consent from buyer; seller remains liable.
- Warranty evidence: Provide OEM warranty certificates at delivery; logo as specified.
- Vendor risk: Termination rights exist if material terms are not met or delivery is not achieved.
- Delivery & acceptance: Final acceptance triggers warranty period; precise delivery schedule not stated.
