Tender Overview
The Southern Railway, under Indian Railways, seeks supply of a Submersible Pump Set (Three Phase) conforming to IS 8034:2018 (Q2) for deployment in Villupuram, Tamil Nadu 604001. The procurement focuses on ISI marked pump assemblies with included control panels, starters, and protective devices, suitable for railway water management. The scope emphasizes IS 8034:2018 compliance, ISI/BIS certification, and OEM-supplied components with an integrated control panel. A key differentiator is the requirement for a complete supply package, including raw materials test certificates and post-delivery documentation. The tender highlights a flexible quantity clause up to 25% and mandatory quality assurances, positioning bidders to align with statutory standards and on-site installation needs.
Technical Specifications & Requirements
- Product: Submersible Pump Set (Three Phase) per IS 8034:2018 (Q2), ISI marked
- Key components: Bore size, Delivery size, pump impeller, motor rating, and maximum current at rated voltage/frequency
- Electrical/controls: Control panel with starter, ISI marked MCB/main switch, ammeter, voltmeter, water level indicator, and single-phase preventer
- Performance metrics: Discharge capacity (LPH), Discharge head, and optional BEE Energy Star rating (use “0” if not applicable)
- Certifications: ISO 9001 for bidder or OEM; mandatory BIS/type test certificates; material test certificate with bid
- Delivery scope: pure supply of goods; after-sales/service terms unspecified but emphasized documentation
- Documentation: OEM/ISI certificates and related test reports required at bid opening
Terms, Conditions & Eligibility
- Volume flexibility: up to 25% increase/decrease in quantity during contract and extended period, with delivery time adjustments
- GST: bidder to determine applicable GST; reimbursement as actuals or applicable rate (whichever lower)
- OEM/import rules: imported products require Indian office for after-sales service; relevant certificate
- Certifications: ISO 9001, BIS/type test certificates, material test certificates to accompany supply
- Documentation: upload all prescribed certificates at bid submission; non-submission may lead to rejection
- Warranty: period stated per specification from final acceptance or post-installation testing
- Payment/terms: scope includes only supply of goods; no explicit payment schedule provided
- Contact: enquiry number provided for queries during bid process
