Tender Overview
Bharat Petroleum Corporation Ltd invites bids for AMC for Inspection and maintenance of fire fighting facilities at BPCL facilities located in KANPUR NAGAR, UTTAR PRADESH 208001. The procurement involves service maintenance, inspection, and upkeep of fire suppression systems, with bid terms allowing quantity adjustments up to 25% during and after contract award. The scope clause specifies Only supply of Goods as the bid price includes all components. The tender emphasizes compliance with delivery timelines linked to the original delivery period and extended periods, with quantitative adjustments calculated as (Additional quantity ÷ Original quantity) × Original delivery period, minimum 30 days. Unique clause rights reserve BPCL to modify contract scope within specified limits, requiring bidder adherence. The process requires bidders to align with the specified option clause and provide competitive pricing under the stated scope.
Technical Specifications & Requirements
- Product category: AMC services for fire fighting facilities (inspection and maintenance)
- Location: BPCL facility, Kanpur Nagar, Uttar Pradesh 208001
- Scope detail: Bid must reflect Only supply of Goods as per ATC/terms; no BOQ items provided
- Delivery framework: Delivery period linked to original order; extended periods based on calculated formula with a minimum of 30 days; option up to 25% quantity change during currency
- Contract terms: Standard option clause rights for quantity and delivery extensions; bidders must comply with these terms in ATC
- Standards/qualifications: Not specifically listed; bidders should prepare to demonstrate capability for fire fighting system inspection and maintenance per industry norms
- EMD/price information: Not specified in data; bidders should await official ATC for deposit and pricing structure
- ATC attachment: ATC document uploaded by BPCL for bidder reference
Terms, Conditions & Eligibility
- Scope of supply: Bid price to include all cost components; interpretation indicates service-oriented AMC with goods scope
- Quantity flexibility: BPCL may increase/decrease quantity by up to 25% during placement and currency of contract
- Delivery time: Original delivery period; additional time calculated as described with minimum 30 days; extended delivery time continues under option clause
- Bid compliance: Bidders must comply with option clause terms as part of ATC
- Bidder readiness: Ensure readiness for variable scope and potential extended timelines; monitor ATC for exact requirements and performance expectations
