GEM

Indian Army Stainless Steel and Electrical Goods Tender 2025 Department of Military Affairs Delhi - ISI/IS 550 Type Items Procurement

Posted

17 Oct 2025, 03:50 pm

Deadline

07 Nov 2025, 04:00 pm

Progress

Issue17 Oct 2025, 03:50 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

322

Category

Stainless steel conical measure for oil jar Five L

Bid Type

Two Packet Bid

Categories 7

Tender Overview

The Indian Army, Department Of Military Affairs, seeks procurement of multiple small- to mid-size items across metalwork and electrical components, including stainless steel conical measures for oil jars (5 L and 2 L), a steel liquid level dipstick, wooden hereha (baruda term unclear), copper winding wires (19 SWG and 20 SWG), MCCB with box (63 Amp), and a phase preventer. The BOQ lists 8 items overall with unspecified quantities, values, or delivery specifics and no start/end dates provided. This procurement appears to cover basic hardware for field or store use, with emphasis on diverse metal and electrical components. The variety of items indicates a broad supply requirement rather than a single-use project. Unique aspects include the mix of metalware and electrical protection equipment under a single tender.

Key Specifications

    • Product/service names and categories:
      • Stainless steel conical measure for oil jar, 5 L
      • Stainless steel conical measure for oil jar, 2 L
      • Steel liquid level measurement dipstick
      • Wooden burada
      • Copper winding wire, 19 SWG
      • Copper winding wire, 20 SWG
      • MCCB with box, 63 Amp
      • Phase preventer
    • Quantities/capacities: Not specified in data; refer to BOQ for exact numbers
    • Estimated value: Not provided in tender data
    • Delivery/installation: Not specified in tender data
    • Standards/Quality: No explicit standards listed in tender data; confirm in official documents

Terms & Conditions

  • EMD amount not disclosed in provided data; verify in bid documents

  • GST applicability to be determined by bidder; reimbursement as actuals or capped by quoted GST

  • Submit required certificates/documents; non-submission leads to rejection

  • Bidder must not be under liquidation or bankruptcy; provide undertaking

Important Clauses

Payment Terms

GST payable by bidder; reimbursement as actuals or at the bidder's quoted rate, whichever is lower

Delivery Schedule

Not specified in the provided data; verify in formal tender documents

Penalties/Liquidated Damages

Not specified in data; intended terms to be confirmed in official bid document

Bidder Eligibility

  • Not under liquidation, court receivership or similar proceedings

  • GST registration and compliant tax status

  • Submit mandatory certificates and OEM authorizations as applicable

Bill of Quantities (BOQ) 8 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 Stainless steel conical measure for oil jar Five L Stainless steel conical measure for oil jar Five L 2 nos oicpmse 25
2 Stainless steel conical measure for oil jar Two L Stainless steel conical measure for oil jar Two L 2 nos oicpmse 25
3 Steel liquid level measurement dipstick Steel liquid level measurement dipstick 2 nos oicpmse 25
4 Wooden burada Wooden burada 300 kg oicpmse 25
5 Copper winding wire Nineteen SWG Copper winding wire Nineteen SWG 8 kg oicpmse 25
6 Copper winding wire for Twenty SWG Copper winding wire for Twenty SWG 5 kg oicpmse 25
7 MCCB with Box Sixty Three Amp MCCB with Box Sixty Three Amp 2 nos oicpmse 25
8 Phase preventer Phase preventer 1 nos oicpmse 25

AI-Powered Bidder Prediction

Companies most likely to bid

Unlock Bidder Insights

AI predictions on likely bidders

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar procurement

4

Financial statements / balance sheet

5

EMD payment proof (DD/online) as applicable

6

Technical bid documents demonstrating compliance

7

OEM authorizations or dealer certificates (if applicable)

8

Any certificates demanded in Bid Document, ATC, or Corrigendum

Frequently Asked Questions

How to bid for Indian Army stainless steel and electrical goods tender 2025?

Bidders should submit GST, PAN, experience certificates, financial statements, EMD proof, and technical bid documents. Ensure OEM authorizations where needed, and upload all required certificates per ATC. Delivery terms and payment conditions will be detailed in the official bid documents; ensure compliance with liquidation status declaration.

What documents are required for the Indian Army procurement in 2025?

Required documents typically include GST registration, PAN, company financial statements, experience certificates for similar work, EMD proof, technical bid, and OEM authorization letters. Ensure all documents align with the Bid Document, ATC, and Corrigendum to avoid rejection.

What are the product specifications for army MCCB with box 63 Amp?

The tender data lists MCCB with box 63 Amp as a item but does not provide detailed specifications. Bidders should verify in the official tender documents for current amp rating, breaking capacity, enclosure type, and mounting dimensions; ensure IS or BIS certifications if required.

When is the deadline to submit bids for this procurement in 2025?

The provided data does not include deadline dates. Bidders must consult the official tender portal or the ATC/Corrigendum for the final submission date and time, along with any pre-bid meeting schedules.

What are the GST considerations for the Indian Army tender in 2025?

Bidders must determine their own GST applicability. The procuring agency will reimburse GST as actuals or at the rate quoted by the bidder, whichever is lower, subject to the quoted GST percentage and applicable tax rules.

What eligibility criteria are required to participate in this Army tender 2025?

Eligibility includes being free from liquidation or bankruptcy, providing undertaking to this effect, and submitting mandatory documents such as GST, PAN, experience certificates, and OEM authorizations. Compliance with ATC, Corrigendum, and any specified standards is mandatory.