Tender Overview
The procurement is for the Indian Army under the Department Of Military Affairs to supply and repair/overhaul a Sewage Treatment Plant (STP) at CBS Sarol. The project scope includes fabrication based on Detailed Design Drawings approved by the buyer, with an approval workflow of 5 days for drawing submission and up to 10 days for modification lists. The incumbent must ensure delivery aligned with approved drawings and account for potential delivery deferral if drawing approvals are delayed. Key prerequisites include vendor financial standing, GST alignment, and data sheet conformity. The bidder must demonstrate prior experience with similar central/state govt procurements (3 years minimum) and must provide end-user certificate if requested. Unique conditions include End User Certification via the buyer’s format and an NDA declaration. This tender emphasizes documentary rigor and post-award drawing validation against supplied data sheets, reducing specification mismatches and ensuring compliance with buyer-approved designs.
Technical Specifications & Requirements
- Scope: Supply and repair/overhaul of STP for CBS Sarol under Indian Army.
- Design validation: Detailed Design Drawings submitted within 5 days of award; buyer to approve or list modifications within 10 days.
- Documentation: Data Sheet for offered products uploaded with bid; ensure technical parameters align with buyer data sheets.
- Compliance: End User Certificate via Buyer’s format if requested; NDA signed on bidder letterhead.
- Experience: Minimum 3 years of regular supply/manufacture of similar Category Products to govt bodies; provide contract copies across consecutive years.
- Financials: Bidder must demonstrate sound financial standing; avoid liquidation or court proceedings; provide undertaking.
- Site/Visit: Optional site visit to CBS Sarol installation site for data gathering.
- GST: Bidder responsible for GST considerations; reimbursement as per actuals or applicable rates (whichever lower) up to quoted GST percentage.
- Data integrity: Any mismatch between bid data sheet and offered product parameters may lead to rejection.
Terms, Conditions & Eligibility
- EMD/Performance: Details not specified in provided data; ensure readiness per buyer terms and future notification.
- Documentation: PAN, GSTIN, cancelled cheque, EFT mandate; submission for Vendor Code creation as part of bid.
- NDA: Non-disclosure declaration on bidder letterhead required; breach triggers legal action.
- End User Certificate: If requested by buyer, provided in buyer’s standard format.
- Experience: Minimum 3 years of supplying similar govt-category products; primary product for bunch bids must meet this criterion.
- Drawings: Approved drawings necessary before fabrication; delays in buyer approvals extend delivery period without LD.
- Data Sheet: Data Sheet alignment mandatory; mismatches may lead to bid rejection.
- Site Visit: Optional but advised for information gathering before bid submission.
