Tender Overview
The Indian Army, under the Department of Military Affairs, invites bids for a package covering CROSS UNIVERSAL JOINT, ASSY HOUSING BLOCK, ENGINE SPEED SENSOR DG 6, BUSHING RUBBER PIVOT BUSH, SEAL KIT FOR HYDRAULIC CYL, SPEEDOMETER CABLE, ROLLER BEARING, ASSY UNIVERSAL JOINT and UJ KIT. Estimated value is ₹58,500. Scope includes Supply, Installation, Testing and Commissioning of the goods at consignee location, with 1-year shelf life for spare parts and OEM warranty at delivery. Location details are not specified, but the contract emphasizes delivery and after-sales support in-India. Unique conditions include a 25% quantity option during and after contracting and minimum post-delivery service coverage.
Technical Specifications & Requirements
- Products listed: CROSS UNIVERSAL JOINT, ASSY HOUSING BLOCK, ENGINE SPEED SENSOR DG 6, BUSHING RUBBER PIVOT BUSH, SEAL KIT FOR HYDRAULIC CYL, SPEEDOMETER CABLE, ROLLER BEARING, ASSY UNIVERSAL JOINT, UJ KIT.
- Scope: Supply, Installation, Testing and Commissioning of goods.
- Shelf life: Minimum 1 year usable shelf life at supply date.
- Warranty: 1 year from final acceptance or post-installation, with OEM warranty certificates required at delivery.
- Service capability: must have established installation, commissioning, training, troubleshooting and maintenance in INDIA with service centres near consignee destinations.
- Delivery terms: option clause allows up to 25% increase/decrease in quantity and corresponding delivery extension; minimum extension rule applies.
- Documentation: compliance with ATC and tender certificates; detailed terms to be uploaded by bidder.
Terms, Conditions & Eligibility
- Emd: Not disclosed; bidders must prepare as per ATC terms.
- Shelf life constraint: minimum 1 year available at supply.
- Warranty: 1 year; OEM certificates required at delivery.
- Scope clarifications: supply, installation, testing & commissioning included; ensure after-sales service network in India.
- Option clause: quantity may be adjusted by up to 25% during contract and extended delivery period calculated per formula; minimum 30 days rule.
- Documentation: all required certificates and documents must be uploaded; non-submission may lead to rejection.
- Delivery: final delivery timeline to be aligned with original delivery order and any extended period per option clause.
- Acceptance: final acceptance occurs post-installation and testing; vendor must rectify breakdowns within guarantee period.