Tender Overview
Bharat Earth Movers Limited (BEML), under the Department of Defence Production, invites bids for Air Conditioners 1.5 Ton with scope covering Supply, Installation, Testing and Commissioning. Project implies procurement through a single contract with potential quantity variation up to 25%, according to the option clause. Location details are not disclosed in the tender data, but the opportunity sits within the defence production framework managed by BEML. The absence of BOQ items signals a broad AC deployment requirement rather than a fixed unit list. The tender emphasizes completion timelines aligned to delivery orders and extended periods, contingent on option exercise. Estimated value and EMD are not disclosed in the available data, shaping bidders to focus on compliance with the contractβs delivery and option terms.
Technical Specifications & Requirements
- Product category: Air Conditioners, 1.5 Ton capacity
- Scope: Supply, Installation, Testing and Commissioning (SITC)
- Delivery framework: Delivery period linked to the last date of original delivery order; additional time formula applies when option quantity is exercised
- Standards/Compliance: Not specified in the data; bidders should verify IS/IEC standards during bid
- Site readiness: SITC implies on-site installation and commissioning requirements post-delivery
- BOQ status: No items listed; implies project-level or site-specific configuration data to be confirmed
Terms, Conditions & Eligibility
- Option Clause allows Β±25% quantity variation during contract and currency, with extended delivery periods based on a defined formula
- Delivery schedule: Commences from the last date of the original delivery order; extended time calculations apply if options are exercised
- Payment/EMD details are not disclosed in the provided data; bidders must confirm with the procuring authority
- Documentation: Standard bid submission documents to be supplied per terms; OEM authorization and compliance certificates should be prepared as per defence procurement norms
- Scope clarity: SITC scope suggests installation and commissioning milestones; bidders should plan for on-site support and warranty considerations
