Tender Overview
Organization: IREL (India) Limited, under the Department of Atomic Energy, invites bids for an ABB MAKE PROCESS PID CONTROLLER, MODEL cm30/1SOSOEO/STD. The tender targets OEM/ABB-authorised dealers or stockists, emphasizing ABB as the sole acceptable make. Location: India. Estimated value and EMD not disclosed in the provided data. The pre-qualification framework centers on ABB brand authenticity, technical specification adherence, and demonstrated prior ABB PID controller supply experience. A key differentiator is strict brand control (ABB) and a 7-year experience window aligned with PSU/government procurement norms. The tender’s scope emphasizes controlled procurement of ABB PROCESS PID CONTROLLERS with supplier credibility and documented installation/completion history.
Technical Specifications & Requirements
- Pre-Qualification Criteria requires OEM certification or ABB-authorised dealer/stockist proof for the offered ABB PROCESS PID CONTROLLER; evidence must include authorization certificates.
- Technical Specification Sheet must be signed and stamped as per NIT.
- Experience Criteria: 7-year window ending 30th September 2025; three similar projects costing at least ₹1,48,402 or two projects at least ₹92,751 or one project at least ₹1,48,402; documentation to include Purchase/Work Orders, Completion Certificates, Tax Invoices or Delivery Challans.
- Average Turnover: minimum ₹55,651 in the last 3 years ending 31st March 2024.
- Public sector and large private entities are deemed acceptable bidders; MSEs/Start-ups may receive relaxation.
- Brand Restriction: Only ABB MAKE PID CONTROLLERS accepted; other makes will be rejected.
- No BOQ items are listed; the procurement appears restricted to a single PID controller model.
Terms, Conditions & Eligibility
- EMD/Payment terms: Not specified in data; bidders must meet standard bid-security norms per ATC.
- Delivery window: Not specified; option clauses govern quantity adjustments up to 25% during contract, with delivery timing anchored to original delivery period and extended time mathematically derived.
- Pre-Qualification Proof: Mandatory ABB OEM authorization; evidentiary documents required; signed technical spec sheet; demonstrated prior ABB PID controller supply.
- Verifications: Bidders failing to meet criteria will be disqualified; MSE/Startup relaxations may apply per policy.