GEM

Indian Army Department of Military Affairs Bearings and Suspension Components Tender 2025 - Front/Rear Bearing Assemblies, Universal Joint, Rubber Buffer

Posted

23 Oct 2025, 12:49 pm

Deadline

03 Nov 2025, 01:00 pm

Progress

Issue23 Oct 2025, 12:49 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

17

Category

Bearing Assy Rear

Bid Type

Two Packet Bid

Key Highlights

  • โ€ข No explicit tender ID or dates included in content
  • โ€ข Option clause permits 25% quantity variation during contract execution
  • โ€ข 5-day design drawing approval window and modification cycle
  • โ€ข Advance sample approval required before bulk production
  • โ€ข Vendor code creation requires PAN, GSTIN, cancelled cheque, EFT mandate
  • โ€ข Delivery timeline adjusts with sample/design delays; LD not applicable for buyer delays

Categories 9

Tender Overview

Organization: Indian Army, Department of Military Affairs. Procurement targets a range of mobility components including ** Bearing Assy Rear, Bearing Assy Front, Needle Roller Bearing Assy Front, Rubber Buffer, Bearing Block Front, Bearing Block Rear, Assy Rear Suspension Bush Upper Link, Assy Rear Suspension Bush Upper Link Frame Size, Assy Rubber Bush Lower Link Rear Suspension, Assy Rubber Bush Lower Link Rear Suspension Frame Size, Universal Joint**. No explicit quantity or unit data is provided, and the estimate value is not disclosed. The tender scope centers on 11 items outlined in the BOQ, with emphasis on supplier capability to fabricate per approved drawings and sample conformity. A key differentiator is buyerโ€™s right to adjust quantities up to 25% during and after contract award, with delivery periods anchored to the original timeline and extended periods. Unique conditions include post-award detailed design drawing approvals and advance sample approvals, affecting start of bulk production. The tenderโ€™s procurement objective is to source critical mobility and linkage components for military applications, under a strict vendor compliance framework.

Technical Specifications & Requirements

  • Delivery and design flow: Detailed Design Drawings must be approved within 5 days of award; buyer will approve or list modifications within 5 days; if the buyer delays, delivery period is adjusted without LD.
  • Sample process: Advance sample approval required before bulk manufacturing; one sample to be submitted within 5 days; approval or modification list in 5 days; delay in sample approval extends delivery, not LD.
  • Vendor prerequisites: Post-award, vendors must provide PAN, GSTIN, cancelled cheque, and EFT mandate certified by bank for vendor code creation.
  • Tender discipline: The clause requires adherence to option quantity adjustments, with delivery timing recalculated by a defined formula and minimum 30 days.

Terms, Conditions & Eligibility

  • EMD/financial terms: Not specified in the available data; bidders should prepare for standard EMD requirements per military procurement practice.
  • Delivery timing: Initial delivery period linked to original schedule with potential extension based on option clause; extended durations calculated as (increased quantity รท original quantity) ร— original delivery period, minimum 30 days.
  • Documentation: Submit PAN, GSTIN, cancelled cheque, EFT mandate; vendor code creation is a precondition to participate; BPA terms require detailed design drawing approvals prior to fabrication.
  • Sample protocol: Advance sample approval before bulk manufacturing; non-conformant samples may trigger retries or contract termination at buyer discretion.

Key Specifications

  • Product categories include bearing assemblies, rubber buffers, bearing blocks, suspension bush assemblies, and universal joints

  • BOQ contains 11 items, though quantities/units are not disclosed

  • Delivery period adjustments use the formula (Increased quantity รท Original quantity) ร— Original delivery period with a minimum of 30 days

  • Approval workflow requires buyer-supplied modifications within 5 days of submission

  • Advance sample approval is mandatory prior to bulk manufacturing; non-conformant samples may lead to contract termination

Terms & Conditions

  • Option quantity adjustments up to 25% during contract; delivery timeline recalculated accordingly

  • 5-day design drawing approval window with buyer feedback and potential modifications

  • Advance sample approval before bulk production; deviations may trigger corrective actions or termination

Important Clauses

Payment Terms

Not explicitly stated; bidders should anticipate standard government procurement payment terms aligned to Indian Army contracts

Delivery Schedule

Original delivery period subject to extension based on the option clause; extended time calculated with the specified formula and minimum 30 days

Penalties/Liquidated Damages

Not specified in provided data; potential penalties may apply per contract terms if delivery delays occur

Bidder Eligibility

  • Must submit PAN, GSTIN, cancelled cheque and EFT mandate

  • Ability to produce Detailed Design Drawings within 5 days of award

  • Capability to supply based on approved drawings and advance samples

Bill of Quantities (BOQ) 11 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 Bearing Assy Rear 2.66336E11 2 nos srjco.48 21
2 Bearing Assy Front 2.85934E11 2 nos srjco.48 21
3 Needle Roller Bearing Assy Front 2.85933E11 2 nos srjco.48 21
4 Rubber Buffer 5.40772E11 1 nos srjco.48 21
5 Bearing Block Front 2.87033E11 2 nos srjco.48 21
6 Bearing Block Rear 5.40333E11 2 nos srjco.48 21
7 Assy Rear Suspension Bush Upper Link 2.87032E11 1 nos srjco.48 21
8 Assy Rear Suspension Bush Upper Link Frame Size 2.87032E11 1 nos srjco.48 21
9 Assy Rubber Bush Lower Link Rear Suspension 2.87032E11 1 nos srjco.48 21
10 Assy Rubber Bush Lower Link Rear Suspension Frame Size 2.87032E11 1 nos srjco.48 21
11 Universal Joint 2.69841E11 2 nos srjco.48 21

AI-Powered Bidder Prediction

Companies most likely to bid

Unlock Bidder Insights

AI predictions on likely bidders

Required Documents

1

PAN Card copy

2

GSTIN copy

3

Cancelled Cheque copy

4

EFT Mandate certified by bank

5

Detailed Design Drawings (within 5 days of award)

6

Advance sample submission (within 5 days of award)

Frequently Asked Questions

How to bid for Indian Army bearing assemblies tender in 2025?

Bidders should prepare PAN, GSTIN, cancelled cheque, and EFT mandate for vendor code creation; submit Detailed Design Drawings within 5 days of award; provide one advance sample within 5 days; ensure compliance with buyer-approved drawings and potential 25% quantity variation.

What documents are required for Army mobility components tender in 2025?

Submit PAN card copy, GSTIN copy, cancelled cheque, EFT mandate certified by bank; provide Detailed Design Drawings within 5 days of award and an advance sample for approval before bulk manufacturing; ensure supplier qualifies for vendor code creation.

What are the delivery terms for the 2025 Indian Army procurement?

Delivery periods may extend if the option clause is exercised; calculated as (increased quantity รท original quantity) ร— original delivery period with a minimum of 30 days; delays in drawing approval or sample approval extend the timeline without LD.

How to ensure compliance with design approvals in Army tenders?

Submit Detailed Design Drawings within 5 days of award; buyer will approve or list modifications within 5 days; bulk supply must follow approved drawings with required modifications; delays by buyer shift delivery timelines without LD.

What is required for advance sample approval in Army components tender?

Provide one advance sample within 5 days of award; buyer will approve or specify modifications within 5 days; delays in sample approval extend delivery timelines; non-conforming samples can trigger fresh samples or termination.

Are there specific certification standards for Army bearing procurements?

The available data does not specify standards; bidders should anticipate standard military procurement norms and ensure documentation for vendor code creation is complete; confirm with buyer for any ISI/ISO or other certifications during bid.

What is the scope of items in the Army tender BOQ?

The BOQ lists 11 items including Bearing Assy Front/Rear, Needle Roller Bearing Assy Front, Rubber Buffers, Bearing Blocks, Suspension Bush assemblies, frame-size variants, and Universal Joint; exact quantities and units are not disclosed in the data.

How will quantity variations affect payment and delivery in Army tenders?

Quantity variations up to 25% are allowed; delivery period adjusts based on the variation using the specified formula; payment terms align to contract terms, with delays potentially compensated by revised schedules rather than LD unless specified.

Similar Tenders

Sleeve Cylinder Assy,Assy Fuel PR Line,Clutch Master Cylinder,Clutch Disc,Spindle Wheel Bearing,Sho

Department of Military Affairs

IMPHAL WEST, MANIPUR

View Details

Bearing Bush,Brush Carrier,Armature,Engaging lever assy,Field Coil,Ball bearing,Oil Seal,Brake Cham

Department of Military Affairs

Ajmer, RAJASTHAN

View Details

Bearing hub,Wheel spindle,Wheel bearing front Right,Steering U J Cross,Steering Gear Box Oil Seal,C

Central Armed Police Forces

FIROZPUR, PUNJAB

View Details