Tender Overview
The procurement is issued by Bharat Heavy Electricals Limited (BHEL) under the Department Of Heavy Industry for a Submersible Pump Set (Three Phase) (V2) as per IS 8034:2018 (Q2), located in HARIDWAR, UTTARAKHAND. The scope centers on supplying ISI marked submersible pump sets with standard features including delivery size, motor rating, and a comprehensive control panel. Key differentiators include compliance with IS 8034:2018, ISI marking, and a built-in single-phase preventer. The contract references a flexible quantity regime (up to ±25%), mandate for on-time delivery, and supplier-ready documentation. This tender emphasizes technical conformity, quality assurances, and adherence to GST terms. Bidder readiness requires ensuring dual annexure submissions, test certificates, and a one-year guarantee from supply date. The opportunity targets suppliers capable of meeting government procurement standards and delivering at the Haridwar store location.
Technical Specifications & Requirements
- Product category: Submersible Pump Set (Three Phase) per IS 8034:2018 (V2) with ISI marking
- Delivery size and motor rating specifics to be provided in the BOQ; ensure compatibility with three-phase supply
- Control panel including starter, ISI marked MCB/main switch, ammeter, voltmeter, water level indicator, and single-phase preventer
- Performance metrics: Discharge capacity (LPH) and Discharge head must meet IS 8034:2018 requirements; Bee Energy Star rating to be reported as 0 if not applicable
- Other categories reiterate product ISI marked and motor/current specifications; ensure alignment with construction and performance needs
- Test certificates and guarantee certificate are required; early delivery is acceptable
- Final inspection at CFFP Store aligns with supply verification and acceptance testing
Terms, Conditions & Eligibility
- EMD and payment terms: 100% payment after receipt, acceptance of material at CFFP, subject to non-discrepant documents within 15 days; discrepancies must be cleared within 7 days. Standard terms may apply if vendor quotes differ from BHEL’s terms
- Quantity flexibility: Up to ±25% change in order quantity during contract execution with proportional delivery time adjustment
- Delivery timeline: Delivery period commences from the last date of original delivery order; minimum additional time is 30 days; option extending delivery within contract rates
- Documents required: PAN, GSTIN, Cancelled cheque, EFT mandate, test certificates, Annexure 1 signed; GST invoice uploaded on GeM portal with GST payment confirmation
- Guarantee: Minimum 1-year guarantee from supply date; early delivery acceptable
- Site acceptance: Final inspection at BHEL store; payment contingent on document clearance and successful acceptance testing