Nalco Bhubaneswar Panel Cooling Fan & Filter Procurement 2025 – Rittal OEM Authorized, 12-Month Warranty, 120-Day Delivery

Posted

27 Oct 2025, 10:38 am

Deadline

24 Nov 2025, 09:00 am

Location

Progress

Issue27 Oct 2025, 10:38 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

80

Category

PANEL COOLING FAN AND FILTER 1

Bid Type

Single Packet Bid

Key Highlights

  • β€’ OEM authorization required: M/s. RITTAL INDIA PVT. LTD. or authorized dealers
  • β€’ Delivery within 120 days from PO; inspection-led acceptance at Nalco Smelter Plant Central Stores
  • β€’ 100% payment after successful inspection; GST payment per GST 2A/anx-2
  • β€’ 12-month manufacturer warranty from acceptance date; supplier to provide warranty certificate
  • β€’ Notable documentation: OEM authorization certificate, product catalogue with detailed specs

Categories 3

Tender Overview

National Aluminium Company Limited (Nalco), Bhubaneswar, invites bids for panel cooling fan and filter sets (Categories: Panel Cooling Fan and Filter 1, 2, 3) with OEM authorization from M/s. RITTAL INDIA PVT. LTD. Authorized dealers may participate with valid authorization. Scope: supply of goods delivered within 120 days of PO, inspected at Nalco Smelter Plant Central Stores, with 100% payment after successful inspection. Warranty: 12 months from material acceptance. Tender requires OEM authorization certificates and catalogues detailing specifications. All materials to be sourced from OEM or authorized channel partners. This procurement emphasizes genuine OEM certification and post-delivery inspection prerequisite, aiming for standardized cooling solutions across Nalco’s central stores. Unique clause: successful tender requires submission of manufacturer authorization and on-site inspection acceptance prior to payment. Unique aspect: strict reliance on OEM or authorized dealer for Rittal components.

Technical Specifications & Requirements

  • Product category: Panel cooling fans and filters (multiple panels 1, 2, 3)
  • OEM requirement: Only principal vendor M/s. RITTAL INDIA PVT. LTD. or their authorized dealers/partners may participate
  • Delivery timeline: 120 days from PO placement; delivery to Nalco Smelter Plant Central Stores
  • Warranty: 12 months from date of acceptance at site; supplier to provide manufacturer guarantee certificate
  • Inspection: Materials accepted only after successful on-site inspection at Nalco Smelter Plant Central Stores
  • Payment: 100% after successful inspection and acceptance; GST paid per GSTR 2A/Anx-2
  • Documentation: OEM authorization certificate, product catalogue with detailed specifications, and technical compliance documents
  • Pricing basis: All-inclusive price covering P&F, freight, transit insurance, GST
  • Tax compliance: Conformance with IT rules (206ab/206cca) and PAN-Aadhaar linkage

Terms, Conditions & Eligibility

  • EMD/guarantee: Not explicitly stated in data; ensure supplier compliance with Nalco’s standard bid security if required
  • Eligibility: Authorized vendors only; genuine OEM authorization must be submitted or bid rejected
  • Delivery & acceptance: 120-day delivery; acceptance requires successful inspection at Nalco Central Stores
  • Payment terms: 100% payment after inspection; GST processing per GST return rules
  • Documentation: Manufacturer authorization, technical catalogues, and compliance certificates to be uploaded with bid
  • Warranty: 12-month manufacturer warranty from acceptance date
  • In-scope scope: Supply of goods only; no services included
  • Quality control: Materials subject to central stores inspection prior to acceptance

Key Specifications

  • Panel cooling fan and filter sets for three panels

  • OEM: Rittal India Pvt. Ltd. with genuine authorization

  • Delivery: 120 days from PO placement

  • Warranty: 12 months from acceptance

  • Payment: 100% after successful inspection

  • Documentation: OEM catalogues and authorization certificates

Terms & Conditions

  • OEM authorization from Rittal India required for eligibility

  • Delivery within 120 days; inspection before acceptance

  • 100% payment after successful inspection; GST as applicable

Important Clauses

Payment Terms

100% payment to be released after successful inspection and acceptance at Nalco Smelter Plant Central Stores; GST processed per GSTR 2A/anx-2

Delivery Schedule

All materials to be delivered within 120 days of PO placement to Nalco Smelter Plant Central Stores

Penalties/Liquidated Damages

Not explicitly stated in provided terms; bidders should assume standard Nalco L1/L2 penalties for late delivery per internal policy

Bidder Eligibility

  • Authorized vendor of M/s. RITTAL INDIA PVT. LTD. or authorized dealers

  • Submission of valid OEM authorization certificate with bid

  • Capability to deliver within 120 days and support 12-month warranty

AI-Powered Bidder Prediction

Companies most likely to bid

Unlock Bidder Insights

AI predictions on likely bidders

Required Documents

1

OEM authorization certificate from M/s. RITTAL INDIA PVT. LTD. or authorized dealer

2

Product catalogue with full specifications

3

Technical compliance certificates and compliance with IT rules (206ab/206cca)

4

GST registration certificate and PAN

5

Experience certificates or past performance with similar panel cooling solutions

6

Inspection report templates or warranties submitted as part of bid

Frequently Asked Questions

How to participate in Nalco Bhubaneswar panel cooling tender with Rittal OEM authorization

Bidders must secure valid OEM authorization from M/s. RITTAL INDIA PVT. LTD. or an authorized dealer, upload the authorization with bid, provide product catalogue, and ensure delivery within 120 days. Payment is released after inspection, and a 12-month warranty is required.

What documents are required for Nalco panel cooling fan and filter bid 2025

Required documents include OEM authorization certificate, product catalogue detailing specifications, GST certificate, PAN, experience certificates, and evidence of inspection capability. Ensure compliance certificates and IT rule alignment (206ab/206cca) are provided with the bid.

What are the delivery timelines for Nalco Rsittal cooling equipment procurement

Delivery must be completed within 120 days of PO placement to Nalco Smelter Plant Central Stores. On-time delivery is critical for acceptance, followed by 100% payment after successful inspection.

What are the payment terms for Nalco cooling fan and filter supply

Payment is 100% after successful inspection and acceptance at Nalco Smelter Plant Central Stores; GST will be paid subject to GSTR 2A/Anx-2 reflection by Nalco.

What warranty is required for Nalco panel cooling components

The contract requires a 12-month manufacturer warranty from the date of acceptance at Nalco, with a certificate submitted along with dispatch documents.

Which supplier categories are eligible for Nalco Rittal tender

Only the principal vendor M/s. RITTAL INDIA PVT. LTD. or their genuine authorized dealers/partners are eligible to participate; an authorisation certificate must accompany the bid.

What is the scope of supply for the Nalco cooling equipment tender

Scope is Only supply of goods (panel cooling fans and filters) with all cost components included in the bid price (P&F, freight, transit insurance, GST). No service component is mentioned.

What happens if OEM authorization is not provided in the bid

Bids lacking valid OEM authorization will be liable for technical rejection per Nalco’s terms and may be deemed unresponsive, given the explicit OEM requirement for participation.

Similar Tenders

OIL FILTER,FAN BELT,PISTON SET COMPLETE,ALTERNATOR,FUEL PIPE,CARBON BUSH,PISTON RING SET

Department of Military Affairs

RAJAURI, JAMMU & KASHMIR

View Details